MEC13-03654
| Final | 9/24/2013 | 9/24/2013 | 9/26/2013 8:18:05 AM | P | NR |
|
|
dennis ###-#### unit 202 >> Inspection requested via web by Dustin Rich complete duct work. droppedoff acca report
|
PLM13-02665
| Plumbing Rough-in | 9/24/2013 | 9/24/2013 | 9/24/2013 2:47:59 PM | P | PASS |
|
|
The lock code to get in the gate is 8072. The lock box code that is on the stairs is 4888 the keys is for unit 201 where the plumbing was redone.. call me if you have any questions Phone #: ###-#### >> Inspection requested via web by Ryan Baker
|
PLM13-00101
| Other | 9/24/2013 | 9/24/2013 | 9/24/2013 12:03:24 PM | P | FAIL |
|
|
pipe cooling tower drainage to sanitary sewer. left correction notice.
|
MEC13-03001
| Final | 9/23/2013 | 9/24/2013 | 9/24/2013 10:26:38 AM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison provide water heater combustion air from crawlspace
|
MEC13-03817
| Rough-in | 9/23/2013 | 9/24/2013 | 9/24/2013 9:50:06 AM | A | PASS |
|
|
PLEASE CALL DAVE WITH QUESTIONS ###-#### Phone #: ###-#### >> Inspection requested via web by Carrie Bracamonte outside fp ri ok
|