BLD13-02286
| FIRE-Conference | 9/23/2013 | 9/23/2013 | | P | |
|
|
Matt phone #: ###-####
|
FIR13-00230
| INSP-Final Inspection | 9/23/2013 | 9/24/2013 | 9/25/2013 7:00:23 AM | P | PASS |
|
|
Reinspection completed satisfactory. First floor dry system trip test passed after corrections made.
|
BLD13-02487
| FIRE-Final Inspection | 9/23/2013 | 9/24/2013 | 9/24/2013 12:08:05 PM | A | PASS |
|
|
Life safety inspection completed acceptable.
|
BLD13-02153
| FIRE-Final Inspection | 9/23/2013 | 9/24/2013 | 9/24/2013 12:02:52 PM | A | PASS |
|
|
Fire life safety completed satisfactory. Inspection passed.
|
FIR13-00420
| INSP-Final Inspection | 9/24/2013 | 9/24/2013 | 9/24/2013 11:56:11 AM | P | PASS |
|
|
Fire sprinkler work passed final walkthrough, okay for final status.
|
FIR13-00491
| INSP-Final Inspection | 9/23/2013 | 9/24/2013 | 9/24/2013 11:51:47 AM | A | PASS |
|
|
Fire alarm work passed functional testing. Permit final approved.
|
BLD13-00843
| BLD-Final | 9/23/2013 | 9/24/2013 | 9/24/2013 9:04:38 AM | A | PASS |
|
|
Life safety inspection passed.
|