Inspections for the day of: Tuesday, September 24, 2013.
Number of inspections: 7
Percentage of inspections complete: 86 %
Percentage of inspections not complete: 14 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-02286 FIRE-Conference9/23/20139/23/2013 P 
Matt phone #: ###-####
FIR13-00230 INSP-Final Inspection9/23/20139/24/20139/25/2013 7:00:23 AMPPASS
Reinspection completed satisfactory. First floor dry system trip test passed after corrections made.
BLD13-02487 FIRE-Final Inspection9/23/20139/24/20139/24/2013 12:08:05 PMAPASS
Life safety inspection completed acceptable.
BLD13-02153 FIRE-Final Inspection9/23/20139/24/20139/24/2013 12:02:52 PMAPASS
Fire life safety completed satisfactory. Inspection passed.
FIR13-00420 INSP-Final Inspection9/24/20139/24/20139/24/2013 11:56:11 AMPPASS
Fire sprinkler work passed final walkthrough, okay for final status.
FIR13-00491 INSP-Final Inspection9/23/20139/24/20139/24/2013 11:51:47 AMAPASS
Fire alarm work passed functional testing. Permit final approved.
BLD13-00843 BLD-Final9/23/20139/24/20139/24/2013 9:04:38 AMAPASS
Life safety inspection passed.