ELE13-01182
| ELE-Aging Inspection | 9/24/2015 | 9/24/2015 | 9/25/2015 11:12:00 AM | | CANC |
|
|
Too busy
|
ELE12-01902
| ELE-Aging Inspection | 9/24/2015 | 9/24/2015 | 9/25/2015 11:11:26 AM | | CANC |
|
|
Too busy
|
ELE15-03024
| Electrical Rough-In | 9/24/2015 | 9/24/2015 | 9/24/2015 4:02:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Service not ready. Rough in ok cover.
|
ELE15-02264
| Final | 9/24/2015 | 9/24/2015 | 9/24/2015 3:35:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Final ok
|
ELE15-02985
| Electrical Rough-In | 9/22/2015 | 9/24/2015 | 9/24/2015 1:05:08 PM | P | PASS |
|
|
Mark Phone #: ###-#### Walls and hardlids rough in ok cover
|
ELE15-03060
| Temporary Service | 9/24/2015 | 9/24/2015 | 9/24/2015 11:04:54 AM | P | PASS |
|
|
temp pole Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|
ELE15-03059
| Temporary Service | 9/24/2015 | 9/24/2015 | 9/24/2015 10:52:28 AM | P | PASS |
|
|
temp pole Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|
ELE15-03055
| Electrical Rough-In | 9/23/2015 | 9/24/2015 | 9/24/2015 10:27:10 AM | A | PASS |
|
|
Rough-in inspection requested. We will have access to the area after 7:30 AM and a journeyman will be at the jobsite for about 3 hours. If no one is present, please call Dave for access instructions. Phone #: ###-#### Inspection requested via web by David Mackey Repair due to water damage. New bath receptacle circuit, arc fault for down bed, new lighting in basement, refed basement receptacles to eliminate old cloth wiring. Rough in ok cover
|
ELE15-03056
| Rough-In Permanent Service | 9/24/2015 | 9/24/2015 | 9/24/2015 9:51:05 AM | A | PASS |
|
|
New 400 amp service has been installed on southeast side of the new shop addition. New 200 amp sub panel is installed inside new shop. Feeds from IPCO and to existing house are installed into 400 amp service. 2 ground rods installed, existing house feed will be converted to 4 wire feed. Phone #: ###-#### Inspection requested via web by Kurt Carlson Service roughin only ok cover p/s u/g n ok
|
ELE15-02525
| Final | 9/23/2015 | 9/24/2015 | 9/24/2015 9:20:19 AM | A | PASS |
|
|
Should all be ready and the side door should be open thanks Phone #: ###-#### Inspection requested via web by Brad Baker Final ok
|
ELE15-02241
| Final | 9/23/2015 | 9/24/2015 | 9/24/2015 8:57:38 AM | A | PASS |
|
|
Mfg and install pan channel letters mounted on raceway reading Vapaholic. All primary power by others Phone #: ###-#### Inspection requested via web by Ken Olsen Final ok
|
ELE15-02545
| Electrical Rough-In | 9/23/2015 | 9/24/2015 | 9/24/2015 8:22:53 AM | A | PASS |
|
|
We are requesting a partial final for the customer service area for tomorrow morning 9/24/15 in the AM between 7am and 8:30am. Our contact is Luke @ ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Clint Tate Ok to occupy customer service area. Temp final ok
|