ESC15-00142
| General Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 4:47:09 PM | | PEND |
|
|
WIP on home and pool foundation. Extensive concrete work has been completed. Washout conducted on spots around site. No discharge or runoff observed. Construction entrance is preventing trackout.
No current issues, but still need to consider erosion control blankets below the wall to protect foundation and prevent hillside erosion.
|
ESC15-00459
| Aging Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 4:03:23 PM | | PASS |
|
|
WIP on detached accessory building. Permit sign is posted, no trackout. Site is in compliance.
|
ESC15-00726
| Site Preparation | 9/24/2015 | 9/24/2015 | 9/24/2015 3:44:22 PM | P | PASS |
|
|
Note - not a site prep, general inspection:
WIP on new parking area and site improvements. No trackout or sediment runoff occuring at site through course of project. DIs have inlet protection. Approved
|
ESC14-00356
| General Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 3:25:04 PM | | PASS |
|
|
|
ESC15-00177
| General Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 2:58:59 PM | | PASS |
|
|
WIP. Perimeter silt fence along backyard slope and native vegetation has been preserved. No corrections issued.
|
ESC15-00477
| Random Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 2:46:46 PM | P | FAIL |
|
|
Loose sediment, stucco washout and fines, and other materials running off site. No perimeter sediment controls on front bank; street and sidewalks very dirty.
CN posted at site:
- re post yellow ESC on site - install fiber wattle per construction details (trenched and staked) along entire front of project - Order street sweeper for street and gutter in front of house - Install construction entrance or block use
- Will inspect tomorrow PM for corrections.
CN posted and voicemail left with Syringa homes RP
|
ESC14-00662
| General Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 2:03:56 PM | | PEND |
|
|
No recent activity. No issues. Site vegetated with weeds, grasses, and wild flowers. Some stockpile and debris removal will be required. Will look into site final soon, no longer used for active staging.
|
ESC15-01117
| Site Preparation | 9/23/2015 | 9/24/2015 | 9/24/2015 2:02:18 PM | P | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
Many SFHs in new RH#6 phase are in progress. Subdivision BMPs installed. Will need street sweeping this weekend. Approved to start. No residents in subdivision, no trackout or offsite discharges observed.
|
ESC15-00891
| General Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 1:25:41 PM | P | PART |
|
|
WIP on pool construction. No washout was used and open lot has been dumped on.
Need to clean lot and pull DI bags when complete.
No hillside erosion issues or trackout.
|
ESC14-01124
| General Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 1:22:07 PM | | PASS |
|
|
Home complete and occupied. All permits for SFH are finaled. Work ongoing for pool installation and covered under ESC15-00891
|
ESC14-01124
| DOC - Permit Finaled | 9/24/2015 | 9/24/2015 | 9/24/2015 1:21:04 PM | P | PASS |
|
|
|
ESC15-00407
| Site Final | 9/23/2015 | 9/24/2015 | 9/24/2015 10:52:50 AM | A | PASS |
|
|
Permit finaled. Sand bag BMP and captured sediment has been cleaned up as requested. ESC permit conditions satisfied.
|
ESC15-00033
| General Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 10:44:08 AM | | PASS |
|
|
WIP on new LHM Honda building. Parking lot has been curbed but is now in process of being graded. Gratz and Auto drive is still not complete and dirt currently. No trackout from auto mall site, no discharges, and no fugitive dust issues. No corrections.
|
ESC15-01244
| Site Preparation | 9/23/2015 | 9/24/2015 | 9/24/2015 10:41:20 AM | A | PASS |
|
|
After 9 // Victoria Phone #: ###-####
Reviewed permit conditions with homeowner. Project within confines of vegetated backyard, no surface water or MS4 system nearby. Permit sign posted at site.
Approved for construction.
|
ESC15-00833
| BMP Violation | 9/24/2015 | 9/24/2015 | 9/24/2015 10:28:50 AM | P | FAIL |
|
|
Warning issued to CBH foremen to pick up loose trash or provide additional trash cans/bins for workers. Train workers on the importance of picking up litter. Wind is blowing the trash and accumulating it along Eightmile Creek if not contained at site.
Brett from CBH he will get additional trash pickup performed and warn employees about the rules.
|
ESC15-00890
| Site Preparation | 9/23/2015 | 9/24/2015 | 9/24/2015 10:15:40 AM | A | PASS |
|
|
Brett Phone #: ###-####
Permit sign posted. Lot is between 2 newly completed homes, so will need to keep clean and trash contained. Peppermill BMPs installed (DI bags, concrete washout). Trash was picked up along Eightmile Creek as requested.
|
ESC15-00329
| Aging Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 9:24:32 AM | | PASS |
|
|
Project compete. ESC conditiions satisfied.
|
ESC15-00329
| DOC - Permit Finaled | 9/24/2015 | 9/24/2015 | 9/24/2015 9:23:56 AM | P | PASS |
|
|
|
ESC15-00360
| General Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 8:40:50 AM | | PASS |
|
|
|