MEC18-04610
| Pressure Test | 9/21/2018 | 9/24/2018 | 9/24/2018 3:51:32 PM | P | PASS |
|
|
Would like PM and call on way. Thank you Phone #: ###-#### Inspection requested via web by Xanti Berria- furnace a/c coil co ok
|
MEC18-01701
| Final | 9/17/2018 | 9/24/2018 | 9/24/2018 3:20:26 PM | P | FAIL |
|
|
Ted- 208 968 6985- after 3pm- needs 2 CO detectors installed
|
MEC18-02537
| Final | 9/24/2018 | 9/24/2018 | 9/24/2018 2:45:47 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola- line set penetration in garage ceiling needs firecaulked- need make up air for dryer closet installed
|
MEC18-02241
| Final | 9/24/2018 | 9/24/2018 | 9/24/2018 2:44:40 PM | P | PASS |
|
|
corrections have been made Phone #: ###-#### Inspection requested via web by Benny Arreola- final ok
|
MIS18-00377
| MEC-Conference | 9/24/2018 | 9/24/2018 | 9/24/2018 2:11:17 PM | P | DONE |
|
|
working w/o permits- left notice stating if mechanical work was done need to pull permit and call in inspection- think its 9721 sunflower should be address not 9790 ?????- 9790 did not seem to be any remodel going on
|
MEC18-03946
| Final | 9/21/2018 | 9/24/2018 | 9/24/2018 1:52:56 PM | P | PASS |
|
|
JULIA ###-#### PLEASE CALL WITH ETA, IF POSSIBLE Phone #: ###-#### Inspection requested via web by Mike Almanza- fireplace final ok- co ok
|
MEC18-04235
| Rough-in | 9/24/2018 | 9/24/2018 | 9/24/2018 1:08:02 PM | P | PASS |
|
|
Zack-please call 30 minutes prior to meet for access Phone #: ###-####- R/I ok
|
MEC18-04235
| Pressure Test | 9/24/2018 | 9/24/2018 | 9/24/2018 1:07:33 PM | P | PASS |
|
|
Zack-please call 30 minutes prior to meet for access Phone #: ###-####- 20lb gas pass
|
MEC18-04006
| Rough-in | 9/24/2018 | 9/24/2018 | 9/24/2018 10:39:04 AM | P | PART |
|
|
Please conduct a mastic inspection on the front half of the building as soon as possible today. Call Aleks ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- seal on duct work front section ok- ok to insulate- need revised drawings onsitew by next inspection- need to add this mech permit to building permit by next inspection
|
MEC18-02924
| Final | 9/23/2018 | 9/24/2018 | 9/24/2018 9:47:51 AM | A | FAIL |
|
|
Code 0316 Manual J onsite. Phone #: ###-#### Inspection requested via web by Angie Thome- need uv protection on linset out side at a/c- tape up rips and tears on arma flex at coil location- need airbalance report onsite couldnt find one- no meter yet
|
MEC18-03460
| Final | 9/24/2018 | 9/24/2018 | 9/24/2018 8:53:03 AM | A | PART |
|
|
Hood system is balanced. Waiting on balance report so I can email. Hoping for a temperory final so his C of O can get signed off this afternoon. Phone #: ###-#### Inspection requested via web by Drew Tverdy- equipment set infinal place ok- need plywood installed in attic for access to roof- need curbs roofed in weather tight- need air balance report- temp occupancy ok- recall in final when all items are completed
|