Inspections for the day of: Monday, September 24, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrian Scoles
TitleMEC INSPECTOR
Phone #914-4915
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC18-04610 Pressure Test9/21/20189/24/20189/24/2018 3:51:32 PMPPASS
Would like PM and call on way. Thank you Phone #: ###-#### Inspection requested via web by Xanti Berria- furnace a/c coil co ok
MEC18-01701 Final9/17/20189/24/20189/24/2018 3:20:26 PMPFAIL
Ted- 208 968 6985- after 3pm- needs 2 CO detectors installed
MEC18-02537 Final9/24/20189/24/20189/24/2018 2:45:47 PMPFAIL
Phone #: ###-#### Inspection requested via web by Benny Arreola- line set penetration in garage ceiling needs firecaulked- need make up air for dryer closet installed
MEC18-02241 Final9/24/20189/24/20189/24/2018 2:44:40 PMPPASS
corrections have been made Phone #: ###-#### Inspection requested via web by Benny Arreola- final ok
MIS18-00377 MEC-Conference9/24/20189/24/20189/24/2018 2:11:17 PMPDONE
working w/o permits- left notice stating if mechanical work was done need to pull permit and call in inspection- think its 9721 sunflower should be address not 9790 ?????- 9790 did not seem to be any remodel going on
MEC18-03946 Final9/21/20189/24/20189/24/2018 1:52:56 PMPPASS
JULIA ###-#### PLEASE CALL WITH ETA, IF POSSIBLE Phone #: ###-#### Inspection requested via web by Mike Almanza- fireplace final ok- co ok
MEC18-04235 Rough-in9/24/20189/24/20189/24/2018 1:08:02 PMPPASS
Zack-please call 30 minutes prior to meet for access Phone #: ###-####- R/I ok
MEC18-04235 Pressure Test9/24/20189/24/20189/24/2018 1:07:33 PMPPASS
Zack-please call 30 minutes prior to meet for access Phone #: ###-####- 20lb gas pass
MEC18-04006 Rough-in9/24/20189/24/20189/24/2018 10:39:04 AMPPART
Please conduct a mastic inspection on the front half of the building as soon as possible today. Call Aleks ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- seal on duct work front section ok- ok to insulate- need revised drawings onsitew by next inspection- need to add this mech permit to building permit by next inspection
MEC18-02924 Final9/23/20189/24/20189/24/2018 9:47:51 AMAFAIL
Code 0316
Manual J onsite. Phone #: ###-#### Inspection requested via web by Angie Thome- need uv protection on linset out side at a/c- tape up rips and tears on arma flex at coil location- need airbalance report onsite couldnt find one- no meter yet
MEC18-03460 Final9/24/20189/24/20189/24/2018 8:53:03 AMAPART
Hood system is balanced. Waiting on balance report so I can email. Hoping for a temperory final so his C of O can get signed off this afternoon. Phone #: ###-#### Inspection requested via web by Drew Tverdy- equipment set infinal place ok- need plywood installed in attic for access to roof- need curbs roofed in weather tight- need air balance report- temp occupancy ok- recall in final when all items are completed