MIS18-00377
| ELE-Conference | 9/24/2018 | 9/24/2018 | 9/24/2018 2:36:00 PM | P | DONE |
|
|
working w/o permits Knocked on door no answer. Posted notice on front door stating 5 business days to start permit process.
|
ELE18-02247
| Final | 9/24/2018 | 9/24/2018 | 9/24/2018 2:20:15 PM | P | PASS |
|
|
Call for access // Mike Phone #: ###-#### Ok final.
|
ELE18-02160
| Final | 9/24/2018 | 9/24/2018 | 9/24/2018 2:19:58 PM | P | NR |
|
|
Call half hour before to meet // Winfred Phone #: ###-#### Going to meet homeowner onsite at 12pm 9/25/18.
|
ELE18-03524
| Permanent Service | 9/20/2018 | 9/24/2018 | 9/24/2018 1:50:30 PM | P | PASS |
|
|
I will be doing a service change that day. I should be ready by the afternoon. Thanks Phone #: ###-#### Inspection requested via web by Craig Korell p/s o/h rec ok
|
ELE18-03408
| Electrical Rough-In | 9/24/2018 | 9/24/2018 | 9/24/2018 1:36:54 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tim Dunlop Had to add service inspect. Need to see terminal barriers on final. Ok cover.
|
ELE18-03408
| Permanent Service | 9/24/2018 | 9/24/2018 | 9/24/2018 1:36:09 PM | P | PASS |
|
|
p/s u/g n ok
|
ELE18-03660
| Conference | 9/24/2018 | 9/24/2018 | 9/24/2018 1:16:21 PM | P | DONE |
|
|
Inspection requested via web by TRENT Swaim Discussed new overhead to re-feed existing service. Talked to contractor about coordinating with IDP.
|
ELE18-03661
| Permanent Service | 9/24/2018 | 9/24/2018 | 9/24/2018 1:00:09 PM | P | PASS |
|
|
Extended the overhead service to clear new house on adjacent lot. Phone #: ###-#### Inspection requested via web by TOM BICANDI p/s o/h rec ok
|
ELE18-02746
| Electrical Rough-In | 9/24/2018 | 9/24/2018 | 9/24/2018 12:03:53 PM | P | PASS |
|
|
This is a rough in for the floor heat only. If you have any questions please feel free to contact Clay ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover floor heat in addition.
|
ELE18-02363
| Electrical Rough-In | 9/20/2018 | 9/24/2018 | 9/24/2018 11:29:23 AM | A | PASS |
|
|
Need to recheck electrical sockets for wire nuts on ground wires. Phone #: ###-#### Inspection requested via web by Petros Paflias Ok cover office. Corrections fixed. Will look at bonding jumper in panel on final. Extra ground bar was added to bottom left of panel. Bonding jumper needed to tie new ground bar to existing.
|
ELE18-02193
| Final | 9/21/2018 | 9/24/2018 | 9/24/2018 10:44:00 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok final.
|
ELE18-03584
| Final | 9/21/2018 | 9/24/2018 | 9/24/2018 9:21:59 AM | A | CANC |
|
|
Jason Curley, tech: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting Should have been a RI inspection. Added RI inspection.
|
ELE18-03584
| Electrical Rough-In | 9/24/2018 | 9/24/2018 | 9/24/2018 9:21:24 AM | P | PASS |
|
|
All items UL listed. Inspection was called in as final. Cancelled final inspection.
|
ELE18-03643
| Electrical Rough-In | 9/21/2018 | 9/24/2018 | 9/24/2018 8:25:36 AM | A | PASS |
|
|
Wall rough-in 2 outlets 1 wall switch in new walls Contact Lance if door is locked Phone #: ###-#### Inspection requested via web by David Feller Ok cover 2 outlets, 1 switch.
|