Inspections for the day of: Monday, September 24, 2018.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM17-03754 PLM-Aging Inspection9/24/20189/24/20189/25/2018 3:23:09 PM NR
left message to call
PLM18-02302 Final9/24/20189/24/20189/24/2018 2:50:59 PMPPASS
Please call before heading out.
Thank you!! Phone #: ###-#### Inspection requested via web by Cory Ogden
PLM17-03141 Other9/21/20189/24/20189/24/2018 2:29:04 PMPPASS
Hey Dan, can you please come by and give some advice on our hot water/boiler manifold set up? Thanks, Becky ; Luke Phone #: ###-#### Inspection requested via web by Becky Granden
PLM18-02399 Final9/24/20189/24/20189/24/2018 1:56:37 PMPPASS
Call half hour before to meet // Winfred Phone #: ###-####
MIS18-00377 PLM-Conference9/24/20189/24/20189/24/2018 1:33:08 PMPPASS
working w/o permits
9721 is doing work without permits. Tagged door
PLM18-04013 Pressure Test9/21/20189/24/20189/24/2018 11:38:22 AMAFAIL
GAS PRESSURE TEST Phone #: ###-#### Inspection requested via web by Kelli Morgan
test with 30 psi gauge at 20 psi
PLM18-03144 Plumbing Rough-in9/23/20189/24/20189/24/2018 11:08:11 AMAFAIL
roof hose bib drain Phone #: ###-#### Inspection requested via web by Raul Castanon
the roof hydraint drain must grade at 1/4/ft
PLM18-02617 Final9/21/20189/24/20189/24/2018 10:53:14 AMAPASS
Inspection requested via web by Nicholas Paige
PLM18-04039 Plumbing Rough-in9/22/20189/24/20189/24/2018 10:42:06 AMAFAIL
Phone #: ###-#### Inspection requested via web by Jeremy Paxman
Provide an accessable cleanout for each double santee or use fixture fittings.
Provide a full size cleanout above the floor or within 5feet of the crawl access
PLM18-03966 Groundwork9/21/20189/24/20189/24/2018 10:14:46 AMAPASS
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER