ELE17-03368
| ELE-Aging Inspection | 9/24/2019 | 9/24/2019 | 9/26/2019 6:10:52 AM | | DONE |
|
|
Please try to coordinate a final inspection
|
ELE19-01838
| Final | 9/23/2019 | 9/24/2019 | 9/24/2019 3:10:55 PM | P | PASS |
|
|
Basileo Phone #: ###-#### Ok final.
|
ELE19-02936
| Final | 9/23/2019 | 9/24/2019 | 9/24/2019 2:18:06 PM | P | PASS |
|
|
Home owner will be home after 1pm. If unable to inspect after 1pm please let us know so we can reschedule. Dylan Phone #: ###-#### Inspection requested via web by Dylan Pierce Ok final.
|
ELE19-03618
| Permanent Service | 9/24/2019 | 9/24/2019 | 9/24/2019 1:49:19 PM | P | PASS |
|
|
Larry Phone #: ###-#### New underground riser w/expansion couple. p/s u/g rec ok
|
ELE18-04010
| Final | 9/24/2019 | 9/24/2019 | 9/24/2019 1:04:22 PM | P | FAIL |
|
|
Call 20 minutes ahead // Tonya Phone #: ###-#### 6 TR recepts need installed garage and GFI protection.
|
ELE19-01009
| Final | 9/17/2019 | 9/24/2019 | 9/24/2019 12:57:46 PM | P | CANC |
|
|
late afternoon would be preferable. Phone #: ###-#### Inspection requested via web by Alan McCon college Changed ot a conf.
|
ELE19-01009
| Conference | 9/24/2019 | 9/24/2019 | 9/24/2019 12:57:13 PM | P | DONE |
|
|
Talked to homeowner about parts he will need to upgrade to 200a service overhead. Grounding, bonding etc. ###-#### homeowner number
|
ELE19-03587
| Electrical Rough-In | 9/23/2019 | 9/24/2019 | 9/24/2019 12:34:12 PM | P | PASS |
|
|
Please give home owner 30 minutes heads up when your on your way please. Megan ###-#### Thanks!!! Phone #: ###-#### Inspection requested via web by Chris Husted Ok cover down bath. 3 lights 1 fan.
|
ELE19-03133
| Final | 9/24/2019 | 9/24/2019 | 9/24/2019 12:31:47 PM | P | PASS |
|
|
Please final. This is the Lamar advertising billboard located at the intersection of State and Wylie. It is not a temporary pole as the main permit records indicates. Phone #: ###-#### Inspection requested via web by David Mackey Ok final. This is to close out permit. No other work was done.
|
ELE19-03612
| Temporary Service | 9/24/2019 | 9/24/2019 | 9/24/2019 11:37:37 AM | P | PASS |
|
|
This place is at the very top of the hill. Temp service underground next to transformer Phone #: ###-#### Inspection requested via web by David Mackey t/s u/g n ok
|
ELE19-03512
| Electrical Rough-In | 9/23/2019 | 9/24/2019 | 9/24/2019 10:59:29 AM | A | PASS |
|
|
Inspection for rough in of floor boxes. Contact is Josh Smith at ###-#### Phone #: ###-#### Inspection requested via web by Candy Magly Ok cover floor boxes inside S entrance of building.
|
ELE19-03603
| Electrical Rough-In | 9/23/2019 | 9/24/2019 | 9/24/2019 10:56:41 AM | A | PASS |
|
|
Walls inspection. Lockbox 3266 Phone #: ###-#### Inspection requested via web by Dean Gernaat Ok cover walls for break rm, janitors closet, bath and server rm.
|
ELE19-03165
| Final | 9/23/2019 | 9/24/2019 | 9/24/2019 10:11:52 AM | A | PASS |
|
|
Chad Vanorden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok final.
|
ELE19-03374
| Final | 9/23/2019 | 9/24/2019 | 9/24/2019 9:42:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by ron ormerod Ok final. Intersystem installed, SLB cover put on.
|
ELE19-03563
| Electrical Rough-In | 9/23/2019 | 9/24/2019 | 9/24/2019 9:06:02 AM | A | PASS |
|
|
call Patrick with questions. inspection for bonding Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok cover EQ plane. Contractor was notified by James Ady about 10' clearence from overhead.
|
ELE19-02954
| Electrical Rough-In | 9/24/2019 | 9/24/2019 | 9/24/2019 8:45:23 AM | A | PASS |
|
|
Please call or text when on your way. Phone #: ###-#### Inspection requested via web by Josh Reeder Ok final. Corrections made
|
ELE18-01606
| Final | 9/23/2019 | 9/24/2019 | 9/23/2019 2:24:52 PM | A | PASS |
|
|
Generator Room Phone #: ###-#### Inspection requested via web by Stephanie Huston Corrections were made to bonding. Generator is not attached to any life safety components. It is to be used for 4 laundry room fans
|