MEC95-00326
| INSP - Final | 9/25/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | | PASS |
|
|
/ / 350 - FNL -OK FINAL
|
MEC95-00343
| INSP - Final | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | PART |
|
|
09/22/95 350 - FNL -OK FINAL NEED TO CHECK ON FLEX PIPE THAT WAS SMASHED LATER.
|
MEC95-00343
| INSP - Final | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | PART |
|
|
09/22/95 350 - FNL -OK FINAL NEED TO CHECK ON FLEX PIPE THAT WAS SMASHED LATER.
|
MEC95-00567
| INSP - Final | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | PASS |
|
|
09/22/95 350 - FNL -OK FINAL
|
MEC95-00567
| INSP - Final | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | PASS |
|
|
09/22/95 350 - FNL -OK FINAL
|
MEC95-00962
| INSP - Retro Fit (check note) | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | PASS |
|
|
09/22/95 350 - REINSPECTION FNL -OK FINAL GP -OK GAS PIPING #27618
|
MEC95-00966
| INSP - Gas pressure test | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | CANC |
|
|
09/25/95 350 -
|
MEC95-01006
| INSP - Gas pressure test | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | PART |
|
|
09/22/95 350 - 1 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED GP -OK GAS PIPING #27624
|
MEC95-01007
| INSP - Final | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | PASS |
|
|
09/22/95 350 - RGHN-OK ROUGH IN
|
MEC95-01007
| INSP - Final | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | PASS |
|
|
09/22/95 350 - RGHN-OK ROUGH IN
|
ELE95-00290
| INSP - Final | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | CANC |
|
|
09/22/95 350 -
|
MEC3047404
| INSP - Final | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | PASS |
|
|
09/22/95 350 - LOX BOX 1250 FNL -OK FINAL
|
MEC3047404
| INSP - Final | 9/22/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | A | PASS |
|
|
09/22/95 350 - LOX BOX 1250 FNL -OK FINAL
|
MEC95-01016
| INSP - Retro Fit (check note) | 9/25/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | P | PASS |
|
|
09/25/95 350 - W/H WATER HEATER OK
|
MEC95-00671
| INSP - Final | 9/25/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | P | PASS |
|
|
09/25/95 350 - FINAL
|
MEC95-00671
| INSP - Final | 9/25/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | P | PASS |
|
|
09/25/95 350 - FINAL
|
MEC95-00702
| INSP - Gas pressure test | 9/25/1995 | 9/25/1995 | 9/25/1995 12:00:00 AM | P | PASS |
|
|
09/25/95 350 - reinspection GAS PIPING OK #27651
|