BLD00-02197
| BLD-Framing/Rough-in | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-01186
| BLD-Final | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | A | FAIL |
|
|
Steve ###-#### need weld conections at beam and base plate. 9/25/2000 10:30:37 AM
|
BLD00-01797
| BLD-Footing | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | A | PART |
|
|
ft rod-- ###-#### placed w/ special insp. pending report. 9/25/2000 11:43:05 AM
|
BLD99-02185
| BLD-Framing/Rough-in | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 16:04:15. Contact: ###-####. good to cover east to west grid line 10 only one side rated tunnels for reinsp c/n . 9/25/2000 11:42:04 AM
|
BLD00-01618
| BLD-Final | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | A | NR |
|
|
FN OCC--BUTCH ###-#### need 20 min lable on tenent door. 9/25/2000 5:19:57 PM
|
BLD99-03148
| BLD-Framing/Rough-in | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PART |
|
|
2 hr stair well ok for exterior cover ok to start interior gyp requirers inisp. in the progreation of attchment. 9/25/2000 5:23:01 PM
|
BLD00-01733
| BLD-Framing/Rough-in | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | CANC |
|
|
rob ###-####
|
BLD00-01427
| BLD-Framing/Rough-in | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | CANC |
|
|
Rob ###-####
|
BLD00-01726
| BLD-Footing | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PART |
|
|
ft insp-- steve ###-#### placed w/special insp. 9/25/2000 2:58:39 PM
|
BLD00-02180
| BLD-Conference | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PASS |
|
|
Jack ###-####
|
BLD00-01473
| BLD-Wall cover | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 09:51:42. Contact: ###-####.
|
BLD00-01331
| BLD-Final | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 10:06:13. Contact: ###-####.
|
BLD00-02136
| BLD-Final | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PASS |
|
|
###-#### final ok pending others sign off. 9/25/2000 3:23:19 PM
|
BLD00-01772
| BLD-Framing/Rough-in | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 10:59:26. Contact: ###-####. need fire protection on strucral beam. 9/25/2000 5:20:34 PM
|
BLD00-01374
| BLD-Concrete | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PART |
|
|
###-#### bar ok pending s/i report. 12 ft lift. 9/25/2000 3:09:52 PM
|