BLD00-00142
| BLD-Framing/Rough-in | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | A | PART |
|
|
fr ###-#### bob
ok to insulate,, need truss fix on # cr,,, and energy report 9/25/2000 12:09:37 PM
|
BLD00-01701
| BLD-Framing/Rough-in | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | A | PART |
|
|
###-####
verified hold downs,, ok to finish shear on inside garage wing walls,, will call for complete shear 9/25/2000 4:22:29 PM
|
BLD00-01234
| BLD-Framing/Rough-in | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 13:30:13. Contact: ###-####. reinspection
|
BLD00-01234
| BLD-Energy code compliance | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-01644
| BLD-Final | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | NR |
|
|
###-####
verify trades 9/25/2000 4:30:01 PM
|
BLD00-02095
| BLD-Final | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PART |
|
|
###-####
1st floor ok for occupancy 9/25/2000 4:17:23 PM
|
BLD00-01953
| BLD-Foundation | 9/22/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PART |
|
|
###-####
special on job,,, ok 9/25/2000 4:14:29 PM
|
BLD00-01736
| BLD-Foundation | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | NR |
|
|
Donny ###-####
|
BLD00-00529
| BLD-Final | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 10:41:25. Contact: ###-####.
|
BLD00-02329
| BLD-Framing/Rough-in | 9/25/2000 | 9/25/2000 | 9/25/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 415 On 9/25/2000
|