BLD01-01071
| BLD-Aging Inspection | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | | NR |
|
|
no call, expires 10- 23-01 9/25/2001 9:09:09 AM
|
BLD01-00606
| BLD-Aging Inspection | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | | NR |
|
|
Apts, WIP. 9/25/2001 9:09:34 AM
|
BLD01-00597
| BLD-Aging Inspection | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | | NR |
|
|
Apts, WIP 9/25/2001 9:09:52 AM
|
BLD01-01498
| BLD-Aging Inspection | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | | PASS |
|
|
record shows pass 7-26-01 9/25/2001 9:59:26 AM
|
BLD01-01194
| BLD-Aging Inspection | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | | NR |
|
|
repair job, expires 11-17-01 9/25/2001 5:02:27 PM
|
BLD01-01066
| BLD-Aging Inspection | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | | NR |
|
|
roof, no call, expires 10-23-01 9/25/2001 9:12:20 AM
|
BLD01-02145
| BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | A | PART |
|
|
russ###-#### please call him first ...masonry walls, met arch onsite...need dowel bars to exist bond beam, ok to grout. NO specs called out for f'c or spec insp??? 9/25/2001 11:07:28 AM
|
BLD01-00843
| BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 13:41:39. Contact: ###-####.
|
BLD01-01689
| BLD-Energy code compliance | 9/24/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | A | PASS |
|
|
###-#### RICK
|
BLD01-00607
| BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 17:10:12. Contact: ###-####. upper floors shear ok 9/25/2001 10:28:19 AM
|
BLD01-00600
| BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 17:11:29. Contact: ###-####. upper floor shear wall nailing ok 9/25/2001 10:28:04 AM
|
BLD01-01689
| BLD-Conference | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/25/2001 8:45:14 AM beam at stairs ok
|
BLD01-01689
| BLD-Framing/Rough-in | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/25/2001 9:21:13 AM beam & fireblocks ok, ok to cover
|
BLD00-02175
| BLD-Conference | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 9/25/2001 4:52:41 PM re: Complaints of removal of exit & some exterior illumination; exit light must be provided, exterior is subject to "P&Z" or Historic review.
|
BLD01-00673
| BLD-Final | 9/24/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 08:06:33. Contact: ###-####.
|
BLD01-02529
| BLD-Foundation | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 07:18:11. Contact: ###-####. C/n need eng's approval & alternate for deletion of concrete header beams at bsmt. windows. Note bolt & hold down req's. 9/26/2001 10:27:49 AM
|
BLD01-01540
| BLD-Final | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | P | FAIL |
|
|
###-#### dan, c/n grab bars, 2 latches at exit door, verify 1hr at surgery room. 9/25/2001 4:40:19 PM
|
BLD00-01649
| BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 3/28/2000 12:00:00 AM | A | PART |
|
|
fr insp mel- ###-#### ; reviewed 2hr wall detail, need install rock wool or SAFB ? 9/28/2001 5:14:27 PM
|