FIR01-00139
| INSP-Final Inspection | 9/20/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | A | FAIL |
|
|
Final Fail A number of corrections to be made 9/25/2001 11:33:05 AM
|
FIR01-00106
| INSP-Final Inspection | 9/24/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | A | PART |
|
|
Ok on underground hydro test 9/25/2001 11:57:24 AM
|
FIR01-00300
| INSP-Supply line flush | 9/24/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | A | PART |
|
|
OK on supply line flush 9/25/2001 11:47:18 AM
|
FIR01-00078
| INSP-Sprinkler Rough-in | 9/25/2001 | 9/25/2001 | 9/25/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 406 On 9/25/2001 3:23:10 PM Spklr rough in 2 areas overspaced. Taped spklr heads, Heads too close to supply registers
|