Inspections for the day of: Wednesday, September 25, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00097 FIRE-Final Inspection9/24/20029/25/20029/25/2002 12:00:00 AMAPASS
fire life safety finaled 9/25/2002 8:48:35 AM
BLD02-00096 FIRE-Final Inspection9/24/20029/25/20029/25/2002 12:00:00 AMAPASS
fire life safety finaled 9/25/2002 8:48:49 AM
FIR02-00293 INSP-Final Inspection9/24/20029/25/20029/25/2002 12:00:00 AMAPASS
fire sprinkler system finaled 9/25/2002 11:53:38 AM
BLD02-01238 FIRE-Final Inspection9/25/20029/25/20029/25/2002 12:00:00 AMAPASS
fire life safety finaled
FIR02-00205 INSP-Final Inspection9/25/20029/25/20029/25/2002 12:00:00 AMAPASS
fire sprinkler system finaled
FIR02-00321 INSP-Final Inspection9/25/20029/25/20029/25/2002 12:00:00 AMAPASS
fire alarm system finaled
FIR02-00347 INSP-Sprinkler Rough-in/Hydro9/25/20029/25/20029/25/2002 12:00:00 AMPFAIL
some of the retaining straps are not wraped around the trusses, the sprinkler pipe in the riser room can not be hung from the angle iron supports on the bottom of the trusses, move the hanger to the top of the truss, in the southeast corner of the building the 1 1/4" til back piece of pipe exceeds the 48" allowed for a unsupported arm over.
BLD02-00745 FIRE-Final Inspection9/25/20029/25/20029/25/2002 12:00:00 AMPPASS
fire life safety finaled 9/25/2002 10:25:41 AM
FIR02-00318 INSP-Final Inspection9/25/20029/25/20029/25/2002 12:00:00 AMPNR
contractor still needs to change out the extended coverage pendant located on the second floor, insulation still needs to be provided at deck and bottom part of overbuilds. The upper part of the overbuilds have been filled with insulation as well as the concealed spaces beneath the windows 9/25/2002 2:40:31 PM
FIR02-00347 INSP-Sprinkler Rough-in/Hydro9/24/20029/25/20029/25/2002 12:00:00 AMPPASS
Above ground and underground hydro test OK. Above ground piping rough-in is OK. Drains, FDC and alarm still needs to be completed 9/26/2002 12:52:44 PM
FIR02-00364 INSP-Sprinkler Rough-in/Hydro9/23/20029/25/20029/23/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 09/23/2002 at 16:01:13. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/23/2002 at 16:04:51.