BLD02-00097
| FIRE-Final Inspection | 9/24/2002 | 9/25/2002 | 9/25/2002 12:00:00 AM | A | PASS |
|
|
fire life safety finaled 9/25/2002 8:48:35 AM
|
BLD02-00096
| FIRE-Final Inspection | 9/24/2002 | 9/25/2002 | 9/25/2002 12:00:00 AM | A | PASS |
|
|
fire life safety finaled 9/25/2002 8:48:49 AM
|
FIR02-00293
| INSP-Final Inspection | 9/24/2002 | 9/25/2002 | 9/25/2002 12:00:00 AM | A | PASS |
|
|
fire sprinkler system finaled 9/25/2002 11:53:38 AM
|
BLD02-01238
| FIRE-Final Inspection | 9/25/2002 | 9/25/2002 | 9/25/2002 12:00:00 AM | A | PASS |
|
|
fire life safety finaled
|
FIR02-00205
| INSP-Final Inspection | 9/25/2002 | 9/25/2002 | 9/25/2002 12:00:00 AM | A | PASS |
|
|
fire sprinkler system finaled
|
FIR02-00321
| INSP-Final Inspection | 9/25/2002 | 9/25/2002 | 9/25/2002 12:00:00 AM | A | PASS |
|
|
fire alarm system finaled
|
FIR02-00347
| INSP-Sprinkler Rough-in/Hydro | 9/25/2002 | 9/25/2002 | 9/25/2002 12:00:00 AM | P | FAIL |
|
|
some of the retaining straps are not wraped around the trusses, the sprinkler pipe in the riser room can not be hung from the angle iron supports on the bottom of the trusses, move the hanger to the top of the truss, in the southeast corner of the building the 1 1/4" til back piece of pipe exceeds the 48" allowed for a unsupported arm over.
|
BLD02-00745
| FIRE-Final Inspection | 9/25/2002 | 9/25/2002 | 9/25/2002 12:00:00 AM | P | PASS |
|
|
fire life safety finaled 9/25/2002 10:25:41 AM
|
FIR02-00318
| INSP-Final Inspection | 9/25/2002 | 9/25/2002 | 9/25/2002 12:00:00 AM | P | NR |
|
|
contractor still needs to change out the extended coverage pendant located on the second floor, insulation still needs to be provided at deck and bottom part of overbuilds. The upper part of the overbuilds have been filled with insulation as well as the concealed spaces beneath the windows 9/25/2002 2:40:31 PM
|
FIR02-00347
| INSP-Sprinkler Rough-in/Hydro | 9/24/2002 | 9/25/2002 | 9/25/2002 12:00:00 AM | P | PASS |
|
|
Above ground and underground hydro test OK. Above ground piping rough-in is OK. Drains, FDC and alarm still needs to be completed 9/26/2002 12:52:44 PM
|
FIR02-00364
| INSP-Sprinkler Rough-in/Hydro | 9/23/2002 | 9/25/2002 | 9/23/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 16:01:13. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/23/2002 at 16:04:51.
|