Inspections for the day of: Thursday, September 25, 2003.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02201 FIRE-Final Inspection9/24/20039/25/20039/25/2003 12:00:00 AMPPASS
Fire life safety is ok. I spoke to the Action people about getting their fire extinguishers inspected 9/25/2003 2:42:14 PM
FIR03-00202 INSP-Alarm Testing9/25/20039/25/20039/25/2003 12:00:00 AMPCANC
per Orlen with Simplexgrinnell the main facp for the hospital has multiple trouble signals including supervisories and a ground fault. Inspection to be called in after problems get solved 9/25/2003 1:52:09 PM
FIR03-00206 INSP-Sprinkler Rough-in9/25/20039/25/20039/25/2003 12:00:00 AMPPART
The prayer sanctuary sprinkler piping is ok to cover 9/25/2003 2:57:07 PM