Inspections for the day of: Monday, September 25, 2006.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM06-03229 Final9/25/20069/25/20069/25/2006 4:48:32 PMPPASS
andrew; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley replaced valve at water heater, tub overflow and installed a trap at the washer final ok
PLM06-03071 Plumbing Rough-in9/25/20069/25/20069/25/2006 3:33:51 PMPPASS
jason; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ri ok with water lines wrapped at slab penetrations.
MEC06-02643 Conference9/25/20069/25/20069/25/2006 2:59:06 PMPPART
please meet at 1:30..thanks met with dix and lee to go over corrections on water heater installed with out a permit.
PLM06-03248 Water and/or Sewer9/25/20069/25/20069/25/2006 9:34:33 AMPFAIL
eddie Note:please call when inspected; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pressurized irrigation, will need to have an r.p. and a sprinkler permit prior to final on this water service.
PLM06-02999 Plumbing Rough-in9/24/20069/25/20069/25/2006 9:20:01 AMAPASS
Scheduled by a contractor via Hello! on 9/24/2006 at 9:00:05 PM. Contact: ###-####.
PLM05-03969 PLM-Aging Inspection9/25/20069/25/20069/25/2006 8:53:54 AM PASS
wip
PLM06-00072 PLM-Aging Inspection9/25/20069/25/20069/25/2006 8:53:39 AM PASS
wip
PLM05-03682 PLM-Aging Inspection9/25/20069/25/20069/25/2006 8:49:12 AM PASS
wip