FIR08-00621
| INSP-Final Inspection | 9/24/2008 | 9/25/2008 | 9/26/2008 7:41:59 AM | P | PASS |
|
|
After hours fire alarm retest passed inspection, permit finaled.
|
FIR08-00426
| INSP-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 4:33:32 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 9/24/2008 at 5:28:56 PM. Contact: ###-####. NOTE: Inspection to be rescheduled per contractor.
|
FIR08-00547
| INSP-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 4:32:03 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 9/24/2008 at 5:28:22 PM. Contact: ###-####. NOTE: Inspection to be rescheduled per conversation with contractor.
|
BLD08-01486
| FIRE-Final Inspection | 9/25/2008 | 9/25/2008 | 9/25/2008 4:31:11 PM | P | PASS |
|
|
Fire life safety final approved, noted restrooms are not functional-rooms are storage use only.
|
FIR08-00289
| INSP-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 2:48:00 PM | P | CANC |
|
|
final Inspection - contact: Todd Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley NOTE: Inspection rescheduled per conversation with contractor pending fire alarm interconnections
|
FIR08-00544
| INSP-Final Inspection | 9/25/2008 | 9/25/2008 | 9/25/2008 2:46:16 PM | P | PART |
|
|
OH rough-in for the "sleers" area only completed today, circled locations on plans approved for cover, noted one head at the reception counter soffit to be added per drawings, flex-head resubmittals verified.
|
FIR08-00523
| INSP-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 2:43:16 PM | A | FAIL |
|
|
Field inspection for the 5th floor only completed today, noted several items in need of revision or adjustment. See 13 item correction notice left on site for a detailed list.
|
BLD08-01294
| FIRE-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 2:41:13 PM | A | NR |
|
|
Need project related fire alarm and sprinkler permit work finals prior to building life safety approval, project is not in condition for final at this time.
|
FIR08-00222
| INSP-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 12:14:02 PM | P | PASS |
|
|
UG fire supply line permit finaled.
|
BLD08-01152
| FIRE-Final Inspection | 9/25/2008 | 9/25/2008 | 9/25/2008 11:27:55 AM | P | PASS |
|
|
All corrections made per last inspection. KR
|
FIR08-00643
| INSP-Sprinkler Rough-in/Hydro | 9/23/2008 | 9/25/2008 | 9/25/2008 10:32:40 AM | P | NR |
|
|
Plans are not available on site, inspection rescheduled per conversation with contractor.
|
BLD08-00824
| FIRE-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 10:25:44 AM | A | PASS |
|
|
Fire life safety field inspection completed acceptable.
|
BLD08-01832
| FIRE-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 12:00:00 AM | A | PASS |
|
|
All corrections made per Forrest last inspection. KR
|
FIR08-00583
| INSP-Final Inspection | 9/24/2008 | 9/25/2008 | 9/25/2008 12:00:00 AM | A | CANC |
|
|
don Phone #: ###-####. Gas company has not turned gas on.KR
|