Inspections for the day of: Thursday, September 25, 2008.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00621 INSP-Final Inspection9/24/20089/25/20089/26/2008 7:41:59 AMPPASS
After hours fire alarm retest passed inspection, permit finaled.
FIR08-00426 INSP-Final Inspection9/24/20089/25/20089/25/2008 4:33:32 PMPNR
Scheduled by a contractor via Hello! on 9/24/2008 at 5:28:56 PM. Contact: ###-####. NOTE: Inspection to be rescheduled per contractor.
FIR08-00547 INSP-Final Inspection9/24/20089/25/20089/25/2008 4:32:03 PMPCANC
Scheduled by a contractor via Hello! on 9/24/2008 at 5:28:22 PM. Contact: ###-####. NOTE: Inspection to be rescheduled per conversation with contractor.
BLD08-01486 FIRE-Final Inspection9/25/20089/25/20089/25/2008 4:31:11 PMPPASS
Fire life safety final approved, noted restrooms are not functional-rooms are storage use only.
FIR08-00289 INSP-Final Inspection9/24/20089/25/20089/25/2008 2:48:00 PMPCANC
final Inspection - contact: Todd
Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley NOTE: Inspection rescheduled per conversation with contractor pending fire alarm interconnections
FIR08-00544 INSP-Final Inspection9/25/20089/25/20089/25/2008 2:46:16 PMPPART
OH rough-in for the "sleers" area only completed today, circled locations on plans approved for cover, noted one head at the reception counter soffit to be added per drawings, flex-head resubmittals verified.
FIR08-00523 INSP-Final Inspection9/24/20089/25/20089/25/2008 2:43:16 PMAFAIL
Field inspection for the 5th floor only completed today, noted several items in need of revision or adjustment. See 13 item correction notice left on site for a detailed list.
BLD08-01294 FIRE-Final Inspection9/24/20089/25/20089/25/2008 2:41:13 PMANR
Need project related fire alarm and sprinkler permit work finals prior to building life safety approval, project is not in condition for final at this time.
FIR08-00222 INSP-Final Inspection9/24/20089/25/20089/25/2008 12:14:02 PMPPASS
UG fire supply line permit finaled.
BLD08-01152 FIRE-Final Inspection9/25/20089/25/20089/25/2008 11:27:55 AMPPASS
All corrections made per last inspection. KR
FIR08-00643 INSP-Sprinkler Rough-in/Hydro9/23/20089/25/20089/25/2008 10:32:40 AMPNR
Plans are not available on site, inspection rescheduled per conversation with contractor.
BLD08-00824 FIRE-Final Inspection9/24/20089/25/20089/25/2008 10:25:44 AMAPASS
Fire life safety field inspection completed acceptable.
BLD08-01832 FIRE-Final Inspection9/24/20089/25/20089/25/2008 12:00:00 AMAPASS
All corrections made per Forrest last inspection. KR
FIR08-00583 INSP-Final Inspection9/24/20089/25/20089/25/2008 12:00:00 AMACANC
don Phone #: ###-####. Gas company has not turned gas on.KR