BLD12-02284
| FIRE-Final Inspection | 9/25/2012 | 9/25/2012 | 9/25/2012 4:07:40 PM | P | PASS |
|
|
Life safety passed.
|
FIR12-00542
| INSP-Sprinkler Rough-in | 9/24/2012 | 9/25/2012 | 9/25/2012 4:05:55 PM | P | CANC |
|
|
Overbooked. Asked contractor to reschedule for tomorrow.
|
BLD12-02495
| FIRE-Final Inspection | 9/21/2012 | 9/25/2012 | 9/25/2012 3:58:44 PM | P | CANC |
|
|
Overbooked. Rescheduled for tomorrow morning per Jeff and my conversation.
|
BLD12-02276
| FIRE-Final Inspection | 9/25/2012 | 9/25/2012 | 9/25/2012 3:52:07 PM | P | PASS |
|
|
Life safety passed. Dave is going to mount the max. storage height signs as discussed.
|
BLD11-02768
| FIRE-Final Inspection | 9/25/2012 | 9/25/2012 | 9/25/2012 3:51:07 PM | P | FAIL |
|
|
Repair the non-functional exit sign and provided approved single action hardware on the three doors as discussed.
|
FIR11-00573
| INSP-Final Inspection | 9/25/2012 | 9/25/2012 | 9/25/2012 2:34:42 PM | P | CANC |
|
|
Don stated he was busy at the mall and would need to reschedule.
|
FIR12-00494
| INSP-Sprinkler Rough-in | 9/25/2012 | 9/25/2012 | 9/25/2012 2:11:01 PM | P | PASS |
|
|
See the city approved plans for the location where the sprinkler piping can be covered. It has been clouded and dated in red.
|
FIR12-00247
| INSP-Supply line flush | 9/25/2012 | 9/25/2012 | 9/25/2012 11:57:42 AM | P | PASS |
|
|
blg 9, Underground supply line flush passed
|
BLD12-00094
| FIRE-Final Inspection | 9/24/2012 | 9/25/2012 | 9/25/2012 11:55:19 AM | A | PASS |
|
|
Life safety passed
|
FIR12-00247
| INSP-Supply line flush | 9/24/2012 | 9/25/2012 | 9/25/2012 11:26:51 AM | A | PASS |
|
|
blg 11,underground supply line flush passed
|
BLD12-01653
| FIRE-Final Inspection | 9/25/2012 | 9/25/2012 | 9/25/2012 11:04:36 AM | P | PASS |
|
|
life safety passed
|
FIR12-00519
| INSP-Final Inspection | 9/24/2012 | 9/25/2012 | 9/25/2012 11:03:09 AM | A | PASS |
|
|
permit finaled.
|
BLD12-01498
| FIRE-Final Inspection | 9/24/2012 | 9/25/2012 | 9/25/2012 10:58:01 AM | A | FAIL |
|
|
Final the project related fire sprinkler permit (remove tape from heads), remove thumbturn dead bolts from both exit doors (keyed ok on main exit), lever hardware at main exit does not override internal lock and the exit sign was non functional.
|
FIR12-00491
| INSP-Final Inspection | 9/24/2012 | 9/25/2012 | 9/25/2012 10:56:03 AM | A | PASS |
|
|
Permit finaled. Separate phone lines and alarm and trouble signals verified.
|
FIR12-00449
| INSP-Final Inspection | 9/24/2012 | 9/25/2012 | 9/25/2012 10:54:59 AM | P | FAIL |
|
|
Permit can be finaled when the tape is removed from the upright sprinkler heads
|
FIR12-00357
| INSP-Final Inspection | 9/24/2012 | 9/25/2012 | 9/25/2012 10:52:28 AM | P | PASS |
|
|
Permit finaled
|