BLD13-02286
| FIRE-Conference | 9/23/2013 | 9/23/2013 | | P | |
|
|
Matt phone #: ###-####
|
FIR13-00170
| INSP-Final Inspection | 9/24/2013 | 9/25/2013 | 9/26/2013 7:18:09 AM | P | FAIL |
|
|
Gatehouse system inspection items inlcude; provde H/S at the workshop, SD at the 1st floor office needs relocated away from the HVAC diffuser, change descriptor at the 2nd floor SD storage room, alarm verification feature appears to be enabled for system smokes, panel map needs to include initiating device locations per review note #26, provide knox box per review comment #27, need FD approval for the toggle switch at the main panel MP. HD not tested at this time. Notification appliances and manual pull stations tested okay.
|
BLD13-02209
| FIRE-Final Inspection | 9/24/2013 | 9/25/2013 | 9/25/2013 2:58:38 PM | P | FAIL |
|
|
Missing approved plans, review comments, permit documents on site. Provide directional indicator at the second exit sign, a fire alarm permit may be required for new cooking appliances.
|
BLD13-01882
| FIRE-Final Inspection | 9/24/2013 | 9/25/2013 | 9/25/2013 2:54:37 PM | P | PASS |
|
|
Remainder of correction items field verified for completion. Fire life safety final approved.
|
BLD13-01020
| FIRE-Final Inspection | 9/24/2013 | 9/25/2013 | 9/25/2013 1:30:05 PM | A | PART |
|
|
Noted correction items at the retail store portion of this permit work passed reinspection. New fuel islands are not yet constructed.
|
FIR13-00398
| INSP-Final Inspection | 9/24/2013 | 9/25/2013 | 9/25/2013 1:26:28 PM | A | PASS |
|
|
Fire alarm work passed inspection. Permit final approved.
|
FIR13-00394
| INSP-Final Inspection | 9/24/2013 | 9/25/2013 | 9/25/2013 1:25:03 PM | A | PASS |
|
|
Scope of work finished. Functional testing passed. Fire alarm permit finaled.
|
BLD13-02496
| FIRE-Final Inspection | 9/24/2013 | 9/25/2013 | 9/25/2013 1:15:35 PM | A | PASS |
|
|
Fire life safety passed.
|