BLD13-01945
| BLD-Framing/Rough-in | 9/25/2013 | 9/25/2013 | 10/1/2013 8:48:45 AM | P | PASS |
|
|
Hi Tony. Not sure if you want to come by and check our tie in on the second story deck. We connected back to the floor joist of the house in four spots. Everything is visible from below. They are laying decking this morning. Darren is on site. 941-*2488 >> Inspection requested via web by Jeff Ware
|
ESC13-00193
| General Inspection | 9/25/2013 | 9/25/2013 | 10/1/2013 8:48:21 AM | | PASS |
|
|
|
BLD12-02198
| BLD-Final | 9/25/2013 | 9/25/2013 | 9/27/2013 1:56:01 PM | P | DONE |
|
|
shawnda Phone #: ###-####
|
BLD13-02164
| BLD-Framing/Rough-in | 9/24/2013 | 9/25/2013 | 9/26/2013 8:30:02 AM | P | PASS |
|
|
Interior shear insepction please-Bobby Phone #: ###-####
|
BLD13-01641
| BLD-Final | 9/25/2013 | 9/25/2013 | 9/26/2013 8:29:13 AM | P | PASS |
|
|
Robert Phone #: ###-####
|
BLD13-00345
| BLD-Framing/Rough-in | 9/25/2013 | 9/25/2013 | 9/26/2013 8:28:47 AM | P | PART |
|
|
ok to insulate,, will need floor truss bracing,, fire place approval
|
BLD13-01965
| BLD-Framing/Rough-in | 9/25/2013 | 9/25/2013 | 9/25/2013 4:36:36 PM | P | PART |
|
|
Jeff Phone #: ###-####,, ok to insulate,, c/n on truss calcs back page
|
BLD13-01998
| BLD-Framing/Rough-in | 9/24/2013 | 9/25/2013 | 9/25/2013 4:25:38 PM | A | NR |
|
|
Phone #: ###-####
|
BLD11-00559
| DOC - Permit Finaled | 9/25/2013 | 9/25/2013 | 9/25/2013 9:34:19 AM | P | PASS |
|
|
no electrical at this time
|
BLD13-02308
| BLD-Foundation | 9/24/2013 | 9/25/2013 | 9/25/2013 9:32:52 AM | A | FAIL |
|
|
RYAN Phone #: ###-####,, need electrical inspection on bonding,, and soils report
|
BLD13-02153
| BLD-Final | 9/24/2013 | 9/25/2013 | 9/25/2013 8:35:34 AM | A | PASS |
|
|
Mike Phone #: ###-####
|