Inspections for the day of: Wednesday, September 25, 2013.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00095 INSP-Final Inspection9/24/20139/25/20139/25/2013 3:42:25 PMPPASS
Permit finaled
BLD12-00811 FIRE-Final Inspection9/25/20139/25/20139/25/2013 2:27:38 PMPFAIL
Provide single action hardware on the pump room doors and provide annual inspections for all of the fire extinguishers. Front door meets requirements for locking hardware though panic is shown. The rear combustible ramp is under 4' in width so it meets the non-sprinkler exception. Exit signs and emergency lights functioned correctly.
FIR13-00502 INSP-Sprinkler Rough-in9/25/20139/25/20139/25/2013 2:24:48 PMPPASS
Rough-in passed and sprinkler piping can be covered. There is one problem with a head blocked at a column. It does not meet the 4 times rule for sprinkler obstructions to extended coverage heads. This will need to be corrected and will be verified at the final.
FIR13-00115 INSP-Final Inspection9/24/20139/25/20139/25/2013 2:14:39 PMAPASS
Permit finaled
BLD13-02175 FIRE-Final Inspection9/24/20139/25/20139/25/2013 9:20:59 AMAPASS
life safety passed
FIR13-00343 INSP-Sprinkler Rough-in9/24/20139/25/20139/25/2013 9:18:31 AMAFAIL
No inspection performed due to the pipe routing not matching the approved plans. Contractor shall contact the plan reviewer to verify if plan modifications are required due to changed hydraulic calculations or if as-builts can be acceptable.