BLD13-00906
| FIRE-Final Inspection | 9/25/2014 | 9/25/2014 | 9/26/2014 8:55:22 AM | P | CANC |
|
|
Canceled due to time constraints.
|
FIR14-00095
| INSP-Sprinkler Rough-in/Hydro | 9/24/2014 | 9/25/2014 | 9/26/2014 8:55:00 AM | P | CANC |
|
|
Canceled due to time constraints
|
BLD14-02052
| FIRE-Final Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 3:37:28 PM | P | PASS |
|
|
Life safety passed. Exit sign not required at the main exit per plan review.
|
FIR14-00674
| INSP-Final Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 3:02:33 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00367
| INSP-Final Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 3:01:40 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00445
| INSP-Sprinkler Rough-in/Hydro | 9/25/2014 | 9/25/2014 | 9/25/2014 2:28:30 PM | P | PASS |
|
|
tenting passed. piping can be covered.
|
FIR14-00419
| INSP-Sprinkler Rough-in | 9/25/2014 | 9/25/2014 | 9/25/2014 2:27:32 PM | P | PASS |
|
|
Tenting passed. Piping can be covered.
|
FIR14-00115
| INSP-Conference | 9/25/2014 | 9/25/2014 | 9/25/2014 2:01:59 PM | A | DONE |
|
|
This inspection is for foam proportioner flow at riser room only. It was verified that a 3% concentration had been achieved. Document to be emailed to Tim for attachment to case.
|
BLD12-01914
| FIRE-Final Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 1:54:14 PM | P | FAIL |
|
|
Inspection was actually a conference with Brad Turk to go over the remaining life safety items prior to a final sign off on this permit. Looks like we just need fire alarm as-builts and an RFI for deletion of the exits out of the north side of the emergency rooms.
|
BLD14-01322
| FIRE-Final Inspection | 9/24/2014 | 9/25/2014 | 9/25/2014 9:52:42 AM | A | PASS |
|
|
Life safety passed
|
FIR14-00630
| INSP-Final Inspection | 9/24/2014 | 9/25/2014 | 9/25/2014 9:50:45 AM | A | PASS |
|
|
Permit finaled
|
FIR14-00526
| INSP-Sprinkler Rough-in | 9/24/2014 | 9/25/2014 | 9/25/2014 9:38:47 AM | A | PASS |
|
|
Sprinkler rough-in passed. Piping can be covered.
|