Inspections for the day of: Thursday, September 25, 2014.
Number of inspections: 18
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-02146 BLD-Final9/19/20149/19/2014 P 
Rick Phone #: ###-####
BLD14-00733 BLD-Final9/25/20149/25/20149/25/2014 4:39:20 PMPNR
garage code is 6973 Phone #: ###-#### Inspection requested via web by Andy Thompson. needs blower door test.
BLD14-02104 BLD-Framing/Rough-in9/24/20149/25/20149/25/2014 4:10:50 PMPPASS
Dan Appel. Please inspect after 3:00 PM Phone #: ###-#### Inspection requested via web by Daniel Appel. All framing issues resolved.
BLD14-02104 BLD-Energy code compliance9/24/20149/25/20149/25/2014 4:10:24 PMPPASS
Dan Appel. Please inspect after 3:00 PM Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD14-00732 BLD-Final9/25/20149/25/20149/25/2014 3:52:53 PMPNR
Garage code is 6939 Phone #: ###-#### Inspection requested via web by Andy Thompson. Needs blower door test results and post.
BLD14-02137 BLD-Framing/Rough-in9/25/20149/25/20149/25/2014 3:31:02 PMPFAIL
Inspection requested via web by Andy Thompson. Ok to insulate. See posted correction notice.
MIS14-00227 BLD-Conference9/25/20149/25/20149/25/2014 2:29:14 PMAFAIL
Holloween store open, need to apply for seasonal certificate of occupancy. A correction notice was issued to submit a floor plan to plan review and schedule all required inspections to obtain a temp. occupancy.
MIS14-00228 BLD-Conference9/25/20149/25/20149/25/2014 2:16:19 PMAFAIL
Holloween store open, need to apply for seasonal certificate of occupancy. This may not be the correct address, it is in the same shopping center as Ross. Actuall address is 303 milwaukee. A correction notice was issued to sybmit floor plan, get all required inspections to obtain a temp. occupancy.
BLD14-01855 BLD-Final9/25/20149/25/20149/25/2014 1:53:30 PMPPASS
Senad Phone #: ###-####
BLD14-01855 DOC - Permit Finaled9/25/20149/25/20149/25/2014 1:53:21 PMPPASS
BLD13-03318 BLD-Conference9/25/20149/25/20149/25/2014 1:34:16 PMPDONE
Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD14-00206 BLD-Energy code compliance9/25/20149/25/20149/25/2014 1:34:00 PMPPART
Richard Phone #: ###-####. fire blocking ok. ok to cover pending fire sprinkler tenting inspection.
GCB14-00102 GCB-Framing9/24/20149/25/20149/25/2014 10:54:34 AMAPART
Please call Scott ###-#### for access 30 min prior. ok to insulate, needs to provide continous bearing to footing underneath column at beam midspan.
GCB14-00126 GCB-Footing9/24/20149/25/20149/25/2014 10:14:37 AMANR
###-####. No one on site, no forms installed. No t ready.
BLD14-02515 BLD-Footing9/24/20149/25/20149/25/2014 10:02:52 AMANR
Pat Phone #: ###-####
BLD14-02514 BLD-Footing9/24/20149/25/20149/25/2014 10:02:22 AMAPASS
Pat Phone #: ###-####
BLD14-00452 BLD-Energy code compliance9/24/20149/25/20149/25/2014 9:49:15 AMAPASS
Kendall Phone #: ###-####. Ok to cover.
BLD14-02226 BLD-Ceiling Grid Inspection9/24/20149/25/20149/25/2014 9:24:16 AMAPASS
James Phone #: ###-####