ESC13-00924
| General Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 3:33:26 PM | | PASS |
|
|
Phase 5 of Pine Tree is nearly filled in. Still the site of the staging area for phase 6, so not yet fully stabsilized. No violations observed.
|
ESC13-01296
| DOC - Permit Finaled | 9/25/2014 | 9/25/2014 | 9/25/2014 2:38:13 PM | P | PASS |
|
|
Pine Village townhome complete. ESC conditions satisfied.
|
ESC13-01294
| DOC - Permit Finaled | 9/25/2014 | 9/25/2014 | 9/25/2014 2:32:00 PM | P | PASS |
|
|
|
ESC13-01295
| DOC - Permit Finaled | 9/25/2014 | 9/25/2014 | 9/25/2014 2:31:01 PM | P | PASS |
|
|
|
ESC13-01308
| Aging Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 2:28:29 PM | | PASS |
|
|
Pine Village townhome. WIP. Shoup Street was swept as requested, and trash service removed many discarded materials. No new corrections, jst continue daily housekeeping. All stormdrain inlets in area of activity are protected.
|
ESC13-01307
| Aging Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 2:28:02 PM | | PASS |
|
|
Pine Village townhome. WIP. Shoup Street was swept as requested, and trash service removed many discarded materials. No new corrections, jst continue daily housekeeping. All stormdrain inlets in area of activity are protected.
|
ESC13-01304
| Aging Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 2:27:39 PM | | PASS |
|
|
Pine Village townhome. WIP. Shoup Street was swept as requested, and trash service removed many discarded materials. No new corrections, jst continue daily housekeeping. All stormdrain inlets in area of activity are protected.
|
ESC13-01306
| Aging Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 2:26:54 PM | | PASS |
|
|
Pine Village townhome. WIP. Shoup Street was swept as requested, and trash service removed many discarded materials. No new corrections, jst continue daily housekeeping. All stormdrain inlets in area of activity are protected.
|
ESC13-01305
| Aging Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 2:26:18 PM | | PASS |
|
|
Pine Village townhome. WIP. Shoup Street was swept as requested, and trash service removed many discarded materials. No new corrections, jst continue daily housekeeping. All stormdrain inlets in area of activity are protected.
|
ESC13-00561
| General Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 2:20:25 PM | | PASS |
|
|
WIP on both phases, both ESC permits active. No further earth distubance and the addition is complete. Work is ongoing on the interior and the exterior is still being used for staging and job trailers.
|
ESC14-00506
| General Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 1:15:30 PM | | PASS |
|
|
|
ESC14-00885
| Site Preparation | 9/24/2014 | 9/25/2014 | 9/25/2014 11:50:05 AM | A | PART |
|
|
Eckart Greenbelt Path
Permit posted, SWPPP/NOI # onsite (no updates or inspection reports included), no dust issues or trackout to Eckart at time of inspection.
Note: No site prep inspection to inspect BMPs was requested as required.
Corrections:
1. Properly stake in loose wattles that are installed. 2. No inlet protection as indicated on site map for the culvert conveying the north channel of Council Springs Creek. 3. Unprotected and disturbed banks along the south channel crossing of of Council Springs Creek . 150-200 meters away from outlet to Boise River.
Notified Jeff at Knife River of issue as well as Syman Company of the problem and requested corrections. Rain forecasted for this weekend so requested corrections before weekend.
|
ESC13-00930
| General Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 9:14:19 AM | | PASS |
|
|
Permit posted at front gate. WIP. Existing vegetation and structural wall contain sediment within site. No trackout to Boise Ave. observed.
|
ESC14-00396
| General Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 8:40:24 AM | | PASS |
|
|
Still preparing to put tennis court surface on the pavement that is already in place. Surrounding areas have been stabilized/landscaped. No violations observed.
|