Inspections for the day of: Friday, September 25, 2015.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00345 INSP-Final Inspection9/24/20159/25/20159/25/2015 2:58:47 PMPPASS
Final fire sprinkler inspection passed/complete
FIR15-00347 INSP-Final Inspection9/23/20159/25/20159/25/2015 2:58:13 PMPPASS
Final fire alarm inspection passed/complete
BLD15-01825 FIRE-Final Inspection9/25/20159/25/20159/25/2015 2:57:14 PMPPASS
Life fire safety passed/complete
FIR15-00644 INSP-Final Inspection9/24/20159/25/20159/25/2015 2:55:14 PMPPASS
Final fire alarm inspection passed/complete
BLD15-00823 FIRE-Final Inspection9/24/20159/25/20159/25/2015 1:14:49 PMPPASS
Life fire safety passed/complete
BLD15-01709 FIRE-Final Inspection9/24/20159/25/20159/25/2015 11:07:15 AMAPART
Partial final for life fire safety passed/complete, per converstaion with Scott Arellano a 30 day TCO authorized. Fire sprinkler heads to be added under processing equipment, once fire sprinkler heads are installed/inspected then Building Permit can be finaled.
FIR15-00589 INSP-Final Inspection9/24/20159/25/20159/25/2015 10:16:18 AMAFAIL
Two different types of audible tones (One audible temporal, the other audible is steady tone) in the apartments, audibles need to be synced together in the event of an alarm. Contractor will reschedule when issue is corrected.
BLD15-01683 FIRE-Final Inspection9/24/20159/25/20159/25/2015 8:56:00 AMAPASS
Life fire safety passed/complete