ELE17-03145
| Electrical Rough-In | 9/25/2017 | 9/25/2017 | 9/25/2017 2:31:01 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian McCullough Ok cover
|
ELE17-03002
| Final | 9/21/2017 | 9/25/2017 | 9/25/2017 2:01:31 PM | A | CANC |
|
|
Solar Array System Final Inspection Phone #: ###-#### Inspection requested via web by Paula Gietzen Amps and volts on disconnect needs filled out.
|
ELE17-03194
| Final | 9/22/2017 | 9/25/2017 | 9/25/2017 1:58:44 PM | P | PASS |
|
|
Please call when on way ###-#### Phone #: ###-#### Inspection requested via web by Randy Fletcher Ok cover.
|
ELE17-02677
| Final | 9/25/2017 | 9/25/2017 | 9/25/2017 1:43:19 PM | P | PASS |
|
|
Call Barry if any questions Phone #: ###-#### Inspection requested via web by Christian Kilpatrick Ok final
|
ELE17-03019
| Electrical Rough-In | 9/25/2017 | 9/25/2017 | 9/25/2017 1:27:17 PM | P | PASS |
|
|
Please take note that Idaho Power will be doing an underground Service and the trench will be dug sometime this week to install the PVC. The Sub-Panel upstairs is Hot and has the new Branch Circuit there, however, not landed due to waiting for Idaho Power to kill power on old panel and inspection for New Service. We need an inspection for the new panel as well to have power swung when Idaho power has completed the underground service at which time I will install the Expansion joint and Schedule 80 riser. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes Ok cover except for panel location. Panel needs moved from over stairs.
|
ELE17-03019
| Permanent Service | 9/25/2017 | 9/25/2017 | 9/25/2017 1:26:26 PM | P | PASS |
|
|
p/s u/g n ok. Eliminating o/h service to underground.
|
ELE17-03196
| Conference | 9/22/2017 | 9/25/2017 | 9/25/2017 12:31:40 PM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Talked about relocation of service. Small porch addition was added which makes the o/h mast more than 4ft back from the facia. Also split buss panel will have a few circuits added too it. Split buss panels are no longer a listed item. Once circuits are added, panel needs to be replaced due to load capabilities.
|
ELE17-03147
| Final | 9/20/2017 | 9/25/2017 | 9/25/2017 12:22:04 PM | P | PASS |
|
|
Please call 30 minutes prior. Phone #: ###-#### Inspection requested via web by Mitch Whited Ok final. See notes about vandalized meter on permanent service inspection.
|
ELE17-03147
| Permanent Service | 9/25/2017 | 9/25/2017 | 9/25/2017 12:21:16 PM | A | PASS |
|
|
p/s o/h rec ok. Talked to the landlord about damage done to meter at apt. #312 1/2. Current tenant has invited a guest in that apparently caused damage to 2 meters on 2 seperate occasions. The first meter was not able to be found by IDP. Power to that unit has been off for a few weeks. Apparently said individual took apart a paint brush to use the metal band as a jumper in place of the meter. Metal band was placed phase to phase which blew up and burned up the existing meter socket. New meter has been installed. This is a major life safety issue.
|
ELE17-03175
| Final | 9/21/2017 | 9/25/2017 | 9/25/2017 9:36:46 AM | P | PASS |
|
|
Please call Heather at ###-#### for access. If you have any questions please call Jeremiah at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell Ok final. Talked to electrician, 15a brkr was used on 12 ga wire to J-Box.
|
ELE16-02094
| Final | 9/22/2017 | 9/25/2017 | 9/25/2017 8:55:07 AM | A | PASS |
|
|
Megan-wife Phone #: ###-####-please call prior for access Ok final. Hottub disconnect is present, no hottub. GFI recept for tub works properly.
|
ELE17-02784
| Electrical Rough-In | 9/24/2017 | 9/25/2017 | 9/25/2017 8:30:01 AM | A | PASS |
|
|
Grid Inspection. Lockbox 2677 Phone #: ###-#### Inspection requested via web by Dean Gernaat Ok cover 2 offices, entry, and main work space ceilings.
|
ELE13-00343
| ELE-Aging Inspection | 9/25/2017 | 9/25/2017 | 9/25/2017 7:10:03 AM | | FAIL |
|
|
No final inspection requested at this time.
|
ELE17-02872
| Final | 9/22/2017 | 9/25/2017 | 9/22/2017 10:38:48 AM | A | CANC |
|
|
David Forbes ###-#### Phone #: ###-#### >> Inspection requested via web by Samatha Solberg Inspection cancelled from web by: Samatha Solberg
|