FIR14-00301
| FIR-Aging Inspection | 9/25/2018 | 9/25/2018 | 10/2/2018 12:00:00 AM | | DONE |
|
|
Emailed Rob requesting acceptance test if this work is complete or void if never done.
|
FIR18-00606
| INSP-Sprinkler Rough-in | 9/25/2018 | 9/25/2018 | 9/25/2018 3:15:07 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Todd Ketterling is the contact for this rough to cover inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00681
| INSP-Sprinkler Rough-in | 9/25/2018 | 9/25/2018 | 9/25/2018 3:14:16 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, area of work approved for cover.
Wii be ready after 2:30 Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00729
| INSP-Supply line flush | 9/25/2018 | 9/25/2018 | 9/25/2018 2:17:25 PM | P | DONE |
|
|
Underground main line flush complete.
UG Flush and Cover Roy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
FIR18-00502
| INSP-Sprinkler Rough-in | 9/25/2018 | 9/25/2018 | 9/25/2018 12:31:40 PM | P | PASS |
|
|
Tenting inspection complete, overhead fire sprinkler piping approved for cover.
Tenting Inspection. Call Anthony if there are any issues. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD18-00916
| FIRE-Final Inspection | 9/24/2018 | 9/25/2018 | 9/25/2018 11:40:49 AM | A | PASS |
|
|
No fire sprinklers, no fire alarms, fire extinguisher is placed with current inspection tag. Final life fire safety inspection for area of work complete.
Jane Phone #: ###-####
|
FIR16-00563
| INSP-Sprinkler Rough-in/Hydro | 9/24/2018 | 9/25/2018 | 9/25/2018 11:39:58 AM | A | PART |
|
|
Hydrostatic test for standpipe 1 and 2, basement wet system and dry system witnessed, no pressure loss observed at riser provided gauges.
dry Coordinate inspection with Lonnie Greenfield Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
FIR18-00637
| INSP-Final Inspection | 9/24/2018 | 9/25/2018 | 9/25/2018 9:52:48 AM | A | CANC |
|
|
Request scheduled for the wrong date, this request is cancelled and the correct date for the inspection request has already been generated.
7am-rafe Phone #: ###-####
|
FIR18-00591
| INSP-Sprinkler Rough-in | 9/24/2018 | 9/25/2018 | 9/25/2018 9:51:35 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Jordan Fuger is the contact for this rough to cover inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00514
| INSP-Final Inspection | 9/24/2018 | 9/25/2018 | 9/25/2018 9:50:48 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
FIR18-00554
| INSP-Final Inspection | 9/24/2018 | 9/25/2018 | 9/25/2018 9:50:47 AM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
FIR18-00279
| INSP-Final Inspection | 9/24/2018 | 9/25/2018 | 9/25/2018 9:50:47 AM | A | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
Adam Phone #: ###-####
|
FIR18-00464
| INSP-Sprinkler Rough-in | 9/24/2018 | 9/25/2018 | 9/24/2018 3:39:19 PM | A | CANC |
|
|
Partial Rough-in Inspection for area A (Memory Care). Matt Robison is point of contact. Phone #: ###-#### >> Inspection requested via web by Randy Knutson Inspection cancelled from web by: Randy Knutson
|