MEC18-04559
| Final | 9/19/2018 | 9/25/2018 | 9/25/2018 4:05:42 PM | P | NR |
|
|
Field super; Chad Robertson Phone #: ###-#### Inspection requested via web by Lisa Whitney- the scheduled time to install the furnace was changed to 9/26/18- nothing to inspect at this time
|
MEC18-04465
| Final | 9/21/2018 | 9/25/2018 | 9/25/2018 3:50:34 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- corrections ok- furnace only co ok
|
MEC17-04521
| Final | 9/21/2018 | 9/25/2018 | 9/25/2018 3:46:05 PM | P | PASS |
|
|
Jack- you called me on this house. we finally were able to schedule with the homeowner for work to be completed between 3pm-5pm on tuesday the 25th. she does want all this done in one trip from the both of us if possible. i can call you when we are heading that way to get this finished finally. call mike ###-#### if you have questoins. thank you! Phone #: ###-#### Inspection requested via web by Aaron Alandt -final ok
|
MEC18-04425
| Rough-in | 9/24/2018 | 9/25/2018 | 9/25/2018 3:38:28 PM | P | FAIL |
|
|
Call Stan prior to going by there ###-#### - Need to provide test evidence that there enough air flow across the smoke detector in it current postion or install the smoke detector in a conventional way on the outside of the duct work so the sample tubes are in the air stream. You will also have to install fire rated access doors in the ceiling next to the smoke detectors
|
MEC18-03970
| Final | 9/25/2018 | 9/25/2018 | 9/25/2018 2:49:01 PM | P | PASS |
|
|
final - call cyrus Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final ok- card signed
|
MEC18-03463
| Final | 9/24/2018 | 9/25/2018 | 9/25/2018 2:36:08 PM | P | NH |
|
|
Please call us when you are on your way so we can call customer per request. Thank you! Inspection requested via web by Dan McFate- called and no answer and no access
|
MEC18-04616
| Pressure Test | 9/25/2018 | 9/25/2018 | 9/25/2018 2:14:37 PM | P | PASS |
|
|
Inspection requested via web by Floyd Floyd Peek- 5lb flue test ok- 20 lb gas test ok- tagged meter
|
MEC18-04642
| Final | 9/25/2018 | 9/25/2018 | 9/25/2018 1:41:32 PM | P | NR |
|
|
Joseph ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- need to remove exisiting water flue out of return plemun and re route- furnace and co ok
|
MEC18-03664
| Rough-in | 9/24/2018 | 9/25/2018 | 9/25/2018 12:17:38 PM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- duct work insulation ok- still need to see light test on grease duct- not completely sure what needed to be seen on this R/I tried calling foreman
|
MEC18-04631
| Rough-in | 9/24/2018 | 9/25/2018 | 9/25/2018 11:56:33 AM | A | NR |
|
|
Inspection requested via web by Floyd Floyd Peek- need man J- 20lb gas pressure not holding- need to see inertbtape on gas line- supply plenum needs insulated- support line set-
|
MEC18-03919
| Rough-in | 9/24/2018 | 9/25/2018 | 9/25/2018 11:38:54 AM | A | FAIL |
|
|
Can you call me to make sure I am here amd can we also scheduale it for mid morning please.
This is for the remainimg rough-in inspection and a gas pressure test. Troy should have the approval on the Manual J in the morning. The flue test has already been done and the walk through on the house.
Thank you Phone #: ###-#### Inspection requested via web by Geff Blecha need b vent clearances- need a double valve open ended tee in gas line for pressure test or discconect gas line from meter
|
MEC18-03332
| Final | 9/24/2018 | 9/25/2018 | 9/25/2018 10:49:38 AM | A | PASS |
|
|
I will send you pics this AM of the fuse we changed. Can you final from picture? Phone #: ###-#### Inspection requested via web by Mary LaFayette- A/C fuse sizes ok- final ok
|
MEC18-04503
| Final | 9/19/2018 | 9/25/2018 | 9/25/2018 10:48:24 AM | A | PASS |
|
|
Please call Randy Hall prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- electric furnace only ok
|
MEC18-04616
| Pressure Test | 9/24/2018 | 9/25/2018 | 9/25/2018 10:20:02 AM | A | CANC |
|
|
Inspection requested via web by Floyd Floyd Peek- rescheduled for PM
|
MEC18-03273
| Final | 9/24/2018 | 9/25/2018 | 9/25/2018 8:38:11 AM | A | PASS |
|
|
AC:2018 Phone #: ###-#### Inspection requested via web by Gary Reeves- line set penetration ok - final ok
|
MEC18-04538
| Final | 9/24/2018 | 9/25/2018 | 9/25/2018 8:20:51 AM | A | PASS |
|
|
Customer is elderly so it takes her a minute to get to the door. She will be home. Phone #: ###-#### Inspection requested via web by Dan McFate- co detectors ok- final ok
|
MEC18-03970
| Final | 9/24/2018 | 9/25/2018 | 9/25/2018 8:09:32 AM | A | NR |
|
|
final - call cyrus Phone #: ###-#### Inspection requested via web by Brandon Sorensen- not ready refrigeration lines going through the roof need sealed- arma flex needs UV protection- penetrations in cooler box need sealed- call in for PM when finished
|
MEC17-03221
| Mec-Aging Inspection | 9/25/2018 | 9/25/2018 | 9/25/2018 7:46:22 AM | | CANC |
|
|
|
MEC17-03322
| Mec-Aging Inspection | 9/25/2018 | 9/25/2018 | 9/25/2018 7:46:10 AM | | CANC |
|
|
|