Inspections for the day of: Wednesday, September 25, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03198 Electrical Rough-In9/25/20199/25/20199/25/2019 2:13:12 PMPPASS
Ready for ceiling inspection. Thank You! Phone #: ###-#### Inspection requested via web by Kelly Felin Ok cover ceiling throughout. Waiting on 3 pendants to come in so boxes can be set in reception area.
ELE19-03582 Electrical Rough-In9/24/20199/25/20199/25/2019 2:12:04 PMPPASS
Greg Phone #: ###-#### Ok cover addition on E side of house.
ELE18-02610 Final9/25/20199/25/20199/25/2019 1:38:47 PMPFAIL
Cesar Phone #: ###-####
1. 2 outside recepts need WR.
2. Spark rings needed in kitchen.
3. Horiz outlet under window needs changed to box to allow box fill. Blue shallow carlon used with holes drilled in back of box so excess wire could be pushed through. Also open ground at this location. Grounds were not inside box, they were pushed in wall.
ELE19-02926 Electrical Rough-In9/24/20199/25/20199/25/2019 12:22:09 PMAPASS
Call Brian at ###-#### 30 minutes prior and he will let you in. Rough in for basement bathroom. Phone #: ###-#### Inspection requested via web by sam petterson Ok cover main floor bath. Home owner will pull permit for doing their own floor heat.
ELE19-02235 Final9/24/20199/25/20199/25/2019 12:21:17 PMAPASS
Phone #: ###-#### Inspection requested via web by Kevin Perez Ok final
ELE19-03623 Electrical Rough-In9/24/20199/25/20199/25/2019 11:33:55 AMAPASS
Phone #: ###-#### Inspection requested via web by Don Conley Ok cover.
1. In unit 102, if opening in kitchen wall that looks into living has a countertop on final stage, we will need and outlet on each side of opening to serve countertop area.
2. Units 10 and 11 will need pop up counter recepts upon final.
3. Unit 100 is good.
ELE19-03365 Final9/24/20199/25/20199/25/2019 10:24:25 AMAPASS
the homeowner will be home in the morning after 8:30

you can call her at 208.859.9315
her name is Laura

thanks guys

Install complete per approved plans; the stamped and approved plans are on site;
For any questions about the work done for this project, call Jed at ###-####; For any questions about the plans or design, call Ryan at ###-#### Phone #: ###-#### Inspection requested via web by Ryan King Ok final. Labels present, terminal blocks used inside panel for connections.
ELE19-01009 Final9/25/20199/25/20199/25/2019 9:21:34 AMAPASS
Phone #: ###-#### Inspection requested via web by Alan McCon college Power was off overnight due to incorrect equipt for application. 200a panel installed still using 100a meter base. 200a meter base was installed, 2 grd rods in place a long with water bond. People do occupy house at this time. p/s o/h n ok