Inspections for the day of: Tuesday, September 26, 2000.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-03174 Rough-in9/25/20009/26/20009/26/2000 12:00:00 AMAFAIL
###-#### gas test failled 9/26/2000 10:58:58 AM
BLD00-02180 BLD-Framing/Rough-in9/25/20009/26/20009/26/2000 12:00:00 AMAPART
firewall Jack ###-#### fire wall ok for erection. 9/26/2000 9:51:37 AM
MEC00-03262 Rough-in9/25/20009/26/20009/26/2000 12:00:00 AMAPASS
Joe ###-####
MEC00-03262 Pressure Test9/25/20009/26/20009/26/2000 12:00:00 AMAPASS
Joe ###-####
MEC00-03205 Final9/25/20009/26/20009/26/2000 12:00:00 AMAPART
###-#### fire place rough in ok not a final. 9/26/2000 10:49:47 AM
BLD00-00514 BLD-Concrete9/25/20009/26/20009/26/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/25/2000 at 16:37:05. Contact: ###-####. first floor deck ok for concrete special insp. apptoved all deck attchment and studs. 9/26/2000 10:11:10 AM
BLD00-02076 BLD-Foundation9/25/20009/26/20009/26/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/25/2000 at 09:08:09. Contact: ###-####. placed w/special insp pending report. 9/26/2000 1:48:51 PM
BLD00-01563 BLD-Concrete9/25/20009/26/20009/26/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/25/2000 at 12:06:22. Contact: ###-####. placed w/special insp pending report. 9/26/2000 1:48:12 PM
BLD00-01386 BLD-Final9/25/20009/26/20009/26/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/25/2000 at 21:22:52. Contact: ###-####. pending health and fire insp. 9/26/2000 5:03:46 PM
BLD00-01765 BLD-Framing/Rough-in9/26/20009/26/20009/26/2000 12:00:00 AMPPASS
###-#### framing and insulation ok for cover. 9/26/2000 4:10:06 PM
MIS00-00195 BLD-Conference9/26/20009/26/20009/26/2000 12:00:00 AMPPASS
r/i on a door Steve( beeper) ###-#### door infil ok for rated const. 9/26/2000 5:27:40 PM
BLD99-03134 BLD-Framing/Rough-in9/26/20009/26/20009/26/2000 12:00:00 AMPPART
r/i-- mark ###-#### framing on restarooms and fur out for kitchen ok unclear as to permit numbers and city has approved plan talked with dan s. for clearity in plan review. 9/26/2000 5:29:25 PM
BLD00-01862 BLD-Framing/Rough-in9/26/20009/26/20009/26/2000 12:00:00 AMPPART
ceiling grid Gene ###-#### suite 700ceilling ok pending mech approval for gas piping. 9/26/2000 5:26:54 PM
BLD00-02707 BLD-Footing9/26/20009/26/20009/26/2000 12:00:00 AMPCANC
Dan Weston ###-####
BLD99-03588 BLD-Framing/Rough-in9/26/20009/26/20009/26/2000 12:00:00 AMPPASS
ceiling Shawn ###-####
BLD99-02186 BLD-Other9/26/20009/26/20009/26/2000 12:00:00 AMPPASS
Added by Inspector: 301 On 9/26/2000 recieved specail insp. final approval letter placed in the archive.