Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-00309 ELE-Aging Inspection9/26/20019/26/20019/26/2001 12:00:00 AM NR
still in progress. 9/26/2001 9:42:55 AM
ELE01-02079 ELE-Aging Inspection9/26/20019/26/20019/26/2001 12:00:00 AM PASS
ok. 9/26/2001 9:43:35 AM
ELE01-03276 Electrical Rough-In9/25/20019/26/20019/26/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/25/2001 at 10:10:48. Contact: ###-####. machine room and work-shop room r/i. ok. 9/26/2001 10:10:34 AM
ELE00-01560 Electrical Rough-In9/25/20019/26/20019/26/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/25/2001 at 10:20:00. Contact: ###-####. 1st floor; commissioner hearing room, raised floor and ceiling r/i. 4th floor; courtroom eastend, raised floor r/i. 5th floor westend courtroom raised floor r/i. 9/26/2001 9:37:52 AM
ELE01-03285 Final9/25/20019/26/20019/26/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/25/2001 at 19:48:22. Contact: ###-####. request should have been for ele r/i 9/26/2001 1:56:20 PM
ELE01-03190 Permanent Service9/24/20019/26/20019/26/2001 12:00:00 AMPPASS
###-####. perm/svc. changed service entrance conductors from overhead to underground feed. .

p/s ug r brien frie #3190-ok
called in to sally for connection to power. 9/26/2001 2:28:18 PM
ELE01-01772 Permanent Service9/26/20019/26/20019/26/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/26/2001 at 09:59:35. Contact: ###-####. corrections completed; perm/svc.

p/s ug n capitol ele #1772-ok
8-unit apartment complex plus house meter. 9/26/2001 3:15:53 PM
ELE01-03285 Electrical Rough-In9/26/20019/26/20019/26/2001 12:00:00 AMPPASS
Added by Inspector: 403 On 9/26/2001 1:57:34 PM remodel: downstairs r/i; upstairs kitchen and diningroom r/i. ok