Inspections for the day of: Wednesday, September 26, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00994 BLD-Final9/25/20019/26/20019/26/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 09/25/2001 at 15:01:56. Contact: .needs ele final first. 9/26/2001 11:28:08 AM
BLD01-02376 BLD-Footing9/25/20019/26/20019/26/2001 12:00:00 AMAPASS
###-#### MAMA
BLD01-01259 BLD-Final9/25/20019/26/20019/26/2001 12:00:00 AMAPART
###-#### RANDY CODE - 7550 c-of c ok. 9/26/2001 12:05:55 PM
BLD01-02529 BLD-Foundation9/25/20019/26/20019/26/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 09/25/2001 at 19:14:53. Contact: ###-####.
BLD01-02503 BLD-Final9/25/20019/26/20019/26/2001 12:00:00 AMAFAIL
###-#### ben home ouner ###-####. Hanger at new (2)-11-7/8" micro lam beam required a 3750 lb hangar c/n posted. 9/26/2001 10:10:58 AM
BLD01-01741 BLD-Framing/Rough-in9/25/20019/26/20019/26/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/25/2001 at 14:01:04. Contact: .ok to sheetrock. 9/26/2001 11:40:10 AM
MIS01-00201 BLD-Conference9/25/20019/26/20019/26/2001 12:00:00 AMPPASS
Rehab request for housing code. Contact Michelle @ ###-#### or ###-#### for access. NOTE: inspection finds no problems with the house, appears to be in good shape,and is approximately only 8 years old. 9/26/2001 3:34:48 PM
BLD01-02597 BLD-Final9/25/20019/26/20019/26/2001 12:00:00 AMPFAIL
fn plans in back on the structure-lyndon- ###-#### re-insp . needs bracing added to keep from swaying. 9/26/2001 1:26:49 PM
BLD01-01925 BLD-Framing/Rough-in9/26/20019/26/20019/26/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/26/2001 at 01:52:24. Contact: ###-####.new metal studs added to the exterior. 9/26/2001 2:30:09 PM
BLD00-02820 BLD-Framing/Rough-in9/26/20019/26/20019/26/2001 12:00:00 AMPFAIL
###-#### john
BLD01-00286 BLD-Framing/Rough-in9/26/20019/26/20019/26/2001 12:00:00 AMPPART
fr insp ###-####- dirk exterior entrance, ok as per plan, contractor has elected to add an addnl metal welded brace at each end, plan only shows 1 in the middle. As also advised by the special inspector. 9/26/2001 1:50:17 PM
MEC01-02883 Rough-in9/26/20019/26/20019/26/2001 12:00:00 AMPPART
no dryer vent has been installed at this time, duct above grid appears ok. 9/26/2001 2:38:55 PM
BLD01-02224 BLD-Conference9/26/20019/26/20019/26/2001 12:00:00 AMPPART
Scheduled by Inspector: 407 On 9/26/2001 2:42:34 PM Called out this day to check job status, They are in full operation , cooking with an oven , Talked with tennant said they will contact Mark Harmon to see about getting permits resolved, advised them to do this asap. 9/26/2001 2:45:43 PM