FIR01-00364
| INSP-Sprinkler Rough-in/Hydro | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 14:28:13. Contact: ###-####. hydro okay on aprtial part of system 9/26/2001 3:42:07 PM
|
BLD01-01575
| FIRE-Final Inspection | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 409 On 9/25/2001 3:24:45 PM ###-#### Wayne Berry
|
FIR01-00357
| INSP-Final Inspection | 9/26/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 409 On 9/26/2001 2:45:18 PM
|
FIR01-00365
| INSP-Final Inspection | 9/26/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 409 On 9/26/2001 2:46:05 PM
|
BLD01-01041
| FIRE-Final Inspection | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 409 On 9/25/2001 12:57:06 PM around 1:00
|