MEC01-02171
| Final | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 09:22:16. Contact: ###-####...off 36th 9/26/2001 10:03:19 AM no doors installed on f/wh enclosure at final 9/26/2001 10:20:48 AM
|
MEC01-02873
| Rough-in | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 12:00:09. Contact: ###-####. r/i ok..gas test failed and need to sleeve gas tite at f/p 9/26/2001 12:15:15 PM
|
MEC01-02721
| Rough-in | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 12:38:22. Contact: ###-####. need fresh air at furnace 9/26/2001 10:45:06 AM
|
MEC01-02721
| Pressure Test | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 12:38:54. Contact: ###-####....by 20th 9/26/2001 10:04:40 AM gas pipe undersized to furn in attic...need to put a test on the old existing line 9/26/2001 10:55:10 AM
|
MEC01-02876
| Pressure Test | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 12:52:11. Contact: ###-####. gage is outside with bushes around it. gas tite covered with walls and cabinets before inspection 9/26/2001 11:49:08 AM
|
MEC01-00439
| Final | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 14:12:32. Contact: ###-####.
|
MEC01-02878
| Final | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 15:38:11. Contact: ###-####. no f/p installed yet 9/26/2001 12:07:42 PM
|
MEC01-02880
| Rough-in | 9/26/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | P | FAIL |
|
|
r/i --judy ###-#### posted corrections 9/26/2001 2:39:10 PM
|
MEC01-02837
| Rough-in | 9/26/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | P | PASS |
|
|
for f/p --rich-- ###-#### f/p ok 9/26/2001 4:30:33 PM
|
MEC01-02838
| Rough-in | 9/26/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | P | PASS |
|
|
rich ###-#### for f/p f/p ok 9/26/2001 4:30:25 PM
|
MEC01-02874
| Rough-in | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 14:01:26. Contact: ###-####.
|
MEC01-02874
| Pressure Test | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 14:01:50. Contact: ###-####.
|
MEC01-02875
| Rough-in | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 14:02:39. Contact: ###-####.
|
MEC01-02875
| Pressure Test | 9/25/2001 | 9/26/2001 | 9/26/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 14:03:01. Contact: ###-####.
|