Inspections for the day of: Thursday, September 26, 2002.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00281 INSP-Final Inspection9/24/20029/26/20029/26/2002 12:00:00 AMAPASS
fire sprinkler system finaled 9/26/2002 1:38:03 PM
BLD02-01560 FIRE-Final Inspection9/25/20029/26/20029/26/2002 12:00:00 AMAPASS
fire life/safety finaled. Structural inspector to verify that thumbturn lock is removed from front door 9/26/2002 2:54:18 PM
BLD02-01321 FIRE-Final Inspection9/25/20029/26/20029/26/2002 12:00:00 AMAFAIL
fire life safety items are ok but could not test the two new fire smoke dampers or the fire alarm. The inspection is to be rescheduled to do this testing 9/26/2002 10:37:15 AM
FIR02-00314 INSP-Conference9/25/20029/26/20029/26/2002 12:00:00 AMADONE
inspection was for a sprinkler rough-in for the corridors and restrooms on the first and second floors. Piping is OK to cover. Contractor will be adding a sidewall sprinkler head beneath the stairs and boxing in the first floor landing 9/26/2002 8:55:36 AM
FIR02-00070 INSP-Final Inspection9/25/20029/26/20029/26/2002 12:00:00 AMAPASS
fire alarm finaled 9/26/2002 10:44:50 AM
BLD01-02399 FIRE-Final Inspection9/26/20029/26/20029/26/2002 12:00:00 AMPFAIL
paint curbing as discussed, paint parking stall in front of the fire hydrant, provide emergency lighting in sanctuary as per the UBC and provide two "fire lane-park in marked stalls only" signs at the entrances to the property 9/26/2002 2:59:29 PM
FIR02-00039 INSP-Final Inspection9/26/20029/26/20029/26/2002 12:00:00 AMPPASS
fire sprinkler system finaled