Inspections for the day of: Friday, September 26, 2003.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01177 BLD-Final9/25/20039/26/20039/26/2003 12:00:00 AMAPASS
allen- ###-#### c/c issued. 9/26/2003 10:27:59 AM
BLD03-01178 BLD-Framing/Rough-in9/25/20039/26/20039/26/2003 12:00:00 AMAPASS
###-#### allen
BLD03-01099 BLD-Energy code compliance9/25/20039/26/20039/26/2003 12:00:00 AMAPASS
###-#### ian
BLD03-01098 BLD-Energy code compliance9/25/20039/26/20039/26/2003 12:00:00 AMAPASS
###-#### ian
BLD03-01752 BLD-Framing/Rough-in9/25/20039/26/20039/26/2003 12:00:00 AMAPASS
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD03-01752 BLD-Energy code compliance9/25/20039/26/20039/26/2003 12:00:00 AMANR
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD03-01886 BLD-Framing/Rough-in9/26/20039/26/20039/26/2003 12:00:00 AMPPART
juso; Phone #: ###-#### Internet Inspection Request from: Darla Downs Framing appears to be OK......Permit reflects Unconditioned space.....Next insp for 2" x 24" horizontal foam with 1/2" thermo break B 4 pouring conc floor as req for conditioned space Need R-19 in wall.....R-38 ceiling.......Fairv N wildwood R Abram...... 9/26/2003 2:33:20 PM
BLD03-01907 BLD-Conference9/26/20039/26/20039/26/2003 12:00:00 AMPDONE
todd; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD03-01037 BLD-Final9/26/20039/26/20039/26/2003 12:00:00 AMPPASS
justin ; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/C issued. Mech appr sticker on furnace 408.

9/26/2003 2:52:32 PM 9/26/2003 2:53:24 PM
MEC03-02630 Final9/23/20039/26/20039/26/2003 12:00:00 AMPPASS
please call homeowner first//###-#### glen