FIR02-00466
| FIR-Aging Inspection | 9/26/2005 | 9/26/2005 | 9/27/2005 3:36:27 PM | | DONE |
|
|
I spoke to John in maintenance and Kirk in safety about getting this permit finaled.They spoke to Charlie at Simplex with me present and Charlie stated he would follow up. I set up a follow up inspection for 10/7/05.
|
FIR02-00113
| FIR-Aging Inspection | 9/26/2005 | 9/26/2005 | 9/27/2005 3:36:06 PM | | DONE |
|
|
I spoke to John in maintenance and Kirk in safety about getting this permit finaled.They spoke to Charlie at Simplex with me present and Charlie stated he would follow up. I set up a follow up inspection for 10/7/05.
|
FIR05-00441
| INSP-Supply line flush | 9/23/2005 | 9/26/2005 | 9/26/2005 3:51:10 PM | P | PASS |
|
|
Underground supply line flush passed
|
FIR05-00072
| INSP-Final Inspection | 9/26/2005 | 9/26/2005 | 9/26/2005 3:04:30 PM | P | PASS |
|
|
Fire alarm permit finaled
|
FIR05-00072
| INSP-Sprinkler Rough-in/Hydro | 9/23/2005 | 9/26/2005 | 9/26/2005 3:04:03 PM | P | PASS |
|
|
This was for a fire alarm inspection not a sprinkler rough-in. Fire alarm permit finaled
|
BLD05-02155
| FIRE-Final Inspection | 9/23/2005 | 9/26/2005 | 9/26/2005 3:01:11 PM | A | FAIL |
|
|
The fire sprinkler plans have been resubmitted per the sprinkler contractor and per the general contractor the fire alarm panel still needs repaired,
|
BLD04-02972
| BLD-Aging Inspection | 9/26/2005 | 9/26/2005 | 9/26/2005 2:50:01 PM | | DONE |
|
|
Dennis is following up on the annual inspection of the fire sprinkler riser
|
FIR03-00082
| FIR-Aging Inspection | 9/26/2005 | 9/26/2005 | 9/26/2005 2:49:01 PM | | DONE |
|
|
I spoke to Jeff Packam and he stated that the job status would be investigated fully and the situation rectified.
|
BLD05-02160
| FIRE-Final Inspection | 9/24/2005 | 9/26/2005 | 9/26/2005 11:21:11 AM | A | FAIL |
|
|
Provide re-certification for the hood suppression system. Air balance reports is ok. Exhaust and makeup air are interconnected.
|