ELE06-03388
| Electrical Rough-In | 9/26/2006 | 9/26/2006 | 9/26/2006 4:32:52 PM | P | PASS |
|
|
Do not inspect until after 1:30 pm today. Work performed by Kyle Sharp.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz ok
|
ELE06-03388
| Final | 9/26/2006 | 9/26/2006 | 9/26/2006 4:32:36 PM | P | PASS |
|
|
Do not inspect until after 1:30 pm today. Work performed by Kyle Sharp.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz
|
ELE06-03586
| Rough-In Permanent Service | 9/25/2006 | 9/26/2006 | 9/26/2006 4:12:45 PM | P | FAIL |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wrong address and permit # told contr at site
|
ELE06-01764
| Final | 9/25/2006 | 9/26/2006 | 9/26/2006 4:11:50 PM | P | FAIL |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corr. 210.52(C) needs outlet left side of cooktop also box fill right side 314.16
|
ELE06-02147
| Final | 9/25/2006 | 9/26/2006 | 9/26/2006 3:47:36 PM | P | PASS |
|
|
brian - call prior for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok
|
ELE06-03539
| Rough-In Permanent Service | 9/26/2006 | 9/26/2006 | 9/26/2006 3:03:23 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Daryl DeGranger/i p/s o/h new ok
|
ELE06-02426
| Electrical Rough-In | 9/26/2006 | 9/26/2006 | 9/26/2006 2:13:57 PM | P | FAIL |
|
|
Inspection of trenches for parking lot light poles.; Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot u/g covered before inspection and shall be 24" where subject to vehicular traffic, 18 other location called
|
ELE06-01294
| Final | 9/25/2006 | 9/26/2006 | 9/26/2006 1:50:09 PM | A | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Tye Tullis met with tye
|
ELE06-02020
| Permanent Service | 9/25/2006 | 9/26/2006 | 9/26/2006 12:50:17 PM | A | PASS |
|
|
idaho power will be opening transformer at 10am so we can pull in feeders, need inspection on service to energize. thanks; Phone #: ###-#### Internet Inspection Request from: ERIC p/s u/g new ok
|
ELE06-02014
| Final | 9/25/2006 | 9/26/2006 | 9/26/2006 10:29:33 AM | A | PASS |
|
|
eric; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok no card
|
ELE06-02353
| Final | 9/26/2006 | 9/26/2006 | 9/26/2006 10:28:57 AM | A | PASS |
|
|
ok
|
ELE06-03591
| Rough-In Permanent Service | 9/25/2006 | 9/26/2006 | 9/26/2006 9:58:25 AM | A | PASS |
|
|
allan; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley r/i ok needs switch and light in attic for equip, needs to address bathrm circuit 210.11(C)(3) p/s u/g new ok
|
ELE06-03582
| Conference | 9/25/2006 | 9/26/2006 | 9/26/2006 9:15:17 AM | A | DONE |
|
|
Ray ###-#### needs to GEC to u/g water pipe, bond hot and cold, needs connectors for GEC
|
ELE06-03573
| Final | 9/25/2006 | 9/26/2006 | 9/26/2006 8:42:31 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Al Masi ok
|
ELE06-03539
| Rough-In Permanent Service | 9/25/2006 | 9/26/2006 | 9/26/2006 8:16:31 AM | A | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Daryl called
|
ELE06-03565
| Final | 9/22/2006 | 9/26/2006 | 9/25/2006 12:33:00 PM | A | PASS |
|
|
mike - unit 912; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok
|