Inspections for the day of: Friday, September 26, 2008.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00512 BMP Violation9/26/20089/26/20089/26/2008 4:21:43 PMPPART
Still missing one waddle around dirt pile in north parkinglot. c/n ssued to RP. Contractor noted that he did not now about this pile. The other pile does have containment.
BLD08-01168 BLD-Framing/Rough-in9/26/20089/26/20089/26/2008 4:20:09 PMPPART
jerry Phone #: ###-####. Hardlids in restrooms, 2nd floor.
BLD08-01127 BLD-Footing9/26/20089/26/20089/26/2008 4:19:33 PMPDEFR
Scheduled by a contractor via Hello! on 9/26/2008 at 9:55:44 AM. Contact: ###-####.
BLD08-01819 BLD-Final9/26/20089/26/20089/26/2008 3:22:37 PMPPASS
preston Phone #: ###-####
BLD08-01819 DOC - Permit Finaled9/26/20089/26/20089/26/2008 3:22:30 PMPPASS
BLD08-01819 BLD-Framing/Rough-in9/26/20089/26/20089/26/2008 3:21:55 PMPPASS
preston Phone #: ###-####
BLD08-01275 BLD-Foundation9/25/20089/26/20089/26/2008 2:50:56 PMPPART
blake note:rebar Phone #: ###-####. Perimeter footings. Special insp. on site.
BLD07-03105 BLD-Final9/25/20089/26/20089/26/2008 2:06:07 PMPNR
Scott Phone #: ###-####. Needs mech final and possibly zoning.
ESC08-00773 Random Inspection9/26/20089/26/20089/26/2008 2:01:23 PMPPASS
BLD08-01958 BLD-Framing/Rough-in9/26/20089/26/20089/26/2008 2:01:01 PMPPART
dillon Phone #: ###-####. ok to cover exteror only. Needs ri and insp. prior to framing insp.
BLD08-01855 BLD-Final9/26/20089/26/20089/26/2008 1:43:47 PMPDONE
dustin-call 1st before insp Phone #: ###-####
BLD08-01855 DOC - Permit Finaled9/26/20089/26/20089/26/2008 1:43:38 PMPPASS
BLD08-00418 BLD-Energy code compliance9/25/20089/26/20089/26/2008 1:42:52 PMPNR
Carl- early pm please Phone #: ###-####
BLD08-00418 BLD-Framing/Rough-in9/26/20089/26/20089/26/2008 1:42:38 PMPPART
Carl- early pm please Phone #: ###-####. Screw pattern for 1st. layer of 5/8 typex at 2hr wall.
ESC08-00152 Random Inspection9/26/20089/26/20089/26/2008 1:41:43 PMPPASS
BLD08-01686 BLD-Framing/Rough-in9/26/20089/26/20089/26/2008 1:10:43 PMPPART
Jose- call 30 mins prior to going Phone #: ###-####. Framing for front door cover. Needs to modify permit to include removal and addition of new siding.
BLD08-01991 BLD-Framing/Rough-in9/24/20089/26/20089/26/2008 12:35:56 PMAPASS
Scheduled by a contractor via Hello! on 9/24/2008 at 1:55:44 PM. Contact: ###-####. Interior steel studs for door infill only.
BLD07-01910 BLD-Framing/Rough-in9/25/20089/26/20089/26/2008 12:07:26 PMAPART
RUSS NOTE: 1ST FLOOR CLASSROOM Phone #: ###-####. Interior steel stud framed walls in areas E and D, 1st floor. ok to insul. ardlids in restrooms ok. STILL NEED TO VERIFY TRHU AND MEMBRANE PENETRATIONS AT 2HR WALL.
BLD08-01294 BLD-Framing/Rough-in9/25/20089/26/20089/26/2008 11:01:38 AMAPASS
Conrad- 4th floor, ceiling tile Phone #: ###-####. ceiling grid 4th floor ok.
BLD08-01152 BLD-Final9/25/20089/26/20089/26/2008 10:32:04 AMAPASS
Donna-opens after 10 am Phone #: ###-####. ok for perm occ. fire has signed off.
BLD08-01832 BLD-Final9/24/20089/26/20089/26/2008 10:30:27 AMAPASS
Scheduled by a contractor via Hello! on 9/24/2008 at 10:28:21 AM. Contact: ###-####. ok for perm occ.
BLD08-01083 BLD-Other9/25/20089/26/20089/26/2008 10:07:34 AMAPART
mike Note: modular wall installulation Phone #: ###-####. Spoke with mike on modular wall system. Insulation is installed. Still need to verify the connection to roof or beams above grid and supply data or insul for class A rating. ok to cover.
BLD08-00636 BLD-Final9/25/20089/26/20089/26/2008 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 9/25/2008 at 9:22:52 PM. Contact: ###-####.