Inspections for the day of: Wednesday, September 26, 2012.
Number of inspections: 22
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00954 Site Preparation9/21/20129/21/2012   
BLD12-01531 BLD-Final9/26/20129/26/20129/27/2012 8:16:25 AMPPASS
reggie Phone #: ###-####
ESC12-00589 Site Final9/25/20129/26/20129/27/2012 8:15:53 AMPPASS
Redge phone
BLD12-02549 BLD-Conference9/25/20129/26/20129/26/2012 4:17:51 PMAPASS
Please call when complete. Phone #: ###-#### >> Inspection requested via web by steve stanard
BLD12-02549 DOC - Permit Finaled9/26/20129/26/20129/26/2012 4:17:34 PMPPASS
BLD12-00364 BLD-Framing/Rough-in9/26/20129/26/20129/26/2012 4:14:43 PMPPASS
jack Phone #: ###-####
BLD12-01544 BLD-Final9/25/20129/26/20129/26/2012 4:14:18 PMPPASS
Cathy Phone #: ###-####
BLD12-01544 DOC - Permit Finaled9/26/20129/26/20129/26/2012 4:14:01 PMPPASS
BLD12-01154 BLD-Final9/26/20129/26/20129/26/2012 3:43:25 PMPPASS
Phone #: 3406693 >> Inspection requested via mobile web by steve jones
BLD12-01154 DOC - Permit Finaled9/26/20129/26/20129/26/2012 3:43:07 PMPPASS
MIS12-00270 BLD-Conference9/26/20129/26/20129/26/2012 3:27:28 PMPCANC
report said looks like building an accessory building in backyard, no permit
Building is actually going to be 2 buildings....Each less than 200 sq ft floor space. Closest Bldg is more than 9' off rear property line.....Both Bldgs are more than 3' off side setback.
MIS12-00270 DOC - Permit Finaled9/26/20129/26/20129/26/2012 3:20:55 PMPPASS
BLD11-00519 BLD-Other9/25/20129/26/20129/26/2012 2:52:42 PMAPART
Roof inspection-Dave Jenkins Phone #: ###-####
Not quite complete .....but what is done is OK.
BLD12-02276 BLD-Final9/25/20129/26/20129/26/2012 2:51:05 PMPPASS
dave Phone #: ###-####
BLD12-02276 DOC - Permit Finaled9/26/20129/26/20129/26/2012 2:50:49 PMPPASS
BLD12-00149 BLD-Final9/25/20129/26/20129/26/2012 2:49:49 PMPPASS
dave Phone #: ###-####
BLD12-00149 DOC - Permit Finaled9/26/20129/26/20129/26/2012 2:49:37 PMPPASS
BLD12-01722 BLD-Final9/25/20129/26/20129/26/2012 2:48:58 PMPNR
dave Phone #: ###-####
Need Zoning OK.......Then can OK for Temp (temp on shell).
BLD12-00761 BLD-Final9/25/20129/26/20129/26/2012 2:47:09 PMPPART
dave Phone #: ###-####
OK for Temp Occ C/N Waiting for some fixes for Select connections on rough sawn framing of Ext. patios and entrys. Eng. to provide stamped paperwork and calcs. Can final when framing insp and passed.
MIS11-00208 BLD-Conference9/25/20129/26/20129/26/2012 10:37:32 AMADEFR
defer to Mech.
BLD12-01393 BLD-Energy code compliance9/25/20129/26/20129/26/2012 10:30:09 AMAPART
Jp Phone #: ###-####
Roof element 1 and 2 are filled with insulation.
ESC12-00589 Site Preparation9/25/20129/26/20129/25/2012 3:08:19 PMPCANC
Redge phone.