PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, September 26, 2013
.
Number of inspections:
21
Percentage of inspections complete:
76 %
Percentage of inspections not complete:
24 %
Contact Information
Inspector
Mike Jordan
Title
BLD-COM/RES INSPECTOR
Phone #
794-9473
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC13-00485
General Inspection
9/19/2013
9/19/2013
ESC13-00566
General Inspection
9/19/2013
9/19/2013
ESC13-00484
General Inspection
9/20/2013
9/20/2013
ESC13-00418
General Inspection
9/25/2013
9/25/2013
ESC13-00604
General Inspection
9/25/2013
9/25/2013
MIS13-00278
BLD-Conference
9/26/2013
9/26/2013
9/26/2013 4:09:37 PM
P
DEFR
Investigate this whole strip mall for reports of new tenants without co's and tenant improvements without permits. Report someone might be living in the separate building off of Denton (4914 Denton) on this same parcel. Call Adele for explination of complaint ###-####. Contacted Scott allerano with MIS permit to defer to fire dept.
BLD13-01509
BLD-Conference
9/25/2013
9/26/2013
9/26/2013 2:50:46 PM
P
DONE
rick Phone #: ###-####. Questions regarding exterior stairs.
GCB13-00044
GCB-Final
9/25/2013
9/26/2013
9/26/2013 2:11:24 PM
P
NR
Braydon ###-#### call first
GCB13-00045
GCB-Final
9/25/2013
9/26/2013
9/26/2013 2:07:48 PM
P
PASS
Braydon ###-#### Call first. Structural final only ok.
GCB13-00043
GCB-Final
9/25/2013
9/26/2013
9/26/2013 2:05:53 PM
P
PASS
Braydon ###-#### call first. Structural final only ok. No card to sign.
BLD13-01727
BLD-Wall Bracing
9/25/2013
9/26/2013
9/26/2013 11:14:56 AM
A
FAIL
Ted Phone #: ###-####. Pick up all missing shear panels on main level. Attach east ENGINEERED shear wall with 8d as noted or provide staple equivelant from engineer.
ESC13-00712
General Inspection
9/26/2013
9/26/2013
9/26/2013 11:02:20 AM
A
PASS
BLD13-01944
BLD-Framing/Rough-in
9/25/2013
9/26/2013
9/26/2013 11:00:48 AM
A
FAIL
Rollo Phone #: ###-####. Install the A35 at 16 inches oc at LVL rim board to double top plate as noted on sheet S1.1 of approved plans. Provide straps at 6x6 to versa lam connection. Ok to insulate. Correction notice posted.
ESC13-00696
General Inspection
9/26/2013
9/26/2013
9/26/2013 10:29:07 AM
A
PASS
BLD13-01909
BLD-Framing/Rough-in
9/25/2013
9/26/2013
9/26/2013 10:28:24 AM
A
PASS
Rollo Phone #: ###-####
ESC13-00667
General Inspection
9/26/2013
9/26/2013
9/26/2013 10:10:40 AM
A
PASS
BLD13-01817
BLD-Energy code compliance
9/25/2013
9/26/2013
9/26/2013 10:07:49 AM
A
PASS
rollo Phone #: ###-####
BLD13-02415
BLD-Final
9/25/2013
9/26/2013
9/26/2013 9:30:18 AM
A
PASS
call before to meet // Jared Phone #: ###-####
BLD13-02415
DOC - Permit Finaled
9/26/2013
9/26/2013
9/26/2013 9:30:03 AM
P
PASS
On site to verify pitch of roof and underlayment. Had roofing contractor (six hoarses roofing, sub for THD) remove two random areas of roof singles to verify underlayment. Noted both areas had a 30 lb base layer and top layer 30lb. ASTM synthetic underlayment. Overall roof pitch was 2:12. This inspection is a scope of work for the re-roof only as noted in permits scope of work.
BLD13-02389
BLD-Final
9/26/2013
9/26/2013
9/26/2013 9:04:02 AM
A
PASS
MH Final Phone #: ###-#### >> Inspection requested via web by Richard Estes
BLD13-02389
DOC - Permit Finaled
9/26/2013
9/26/2013
9/26/2013 9:03:51 AM
P
PASS