BLD14-02496
| FIRE-Final Inspection | 9/23/2014 | 9/26/2014 | 9/26/2014 4:12:37 PM | P | PASS |
|
|
C/N items verified for completion. Life safety passed.
|
FIR14-00629
| INSP-Alarm Testing | 9/25/2014 | 9/26/2014 | 9/26/2014 4:08:40 PM | P | PASS |
|
|
Fire alarm testing passed after corrections made while on site.
|
BLD14-00767
| FIRE-Final Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 4:06:38 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
FIR14-00694
| INSP-Final Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 4:05:08 PM | P | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR14-00261
| INSP-Sprinkler Rough-in | 9/25/2014 | 9/26/2014 | 9/26/2014 11:23:40 AM | A | PART |
|
|
Verified drops to pendent heads at 1st floor east side unit restrooms for sheetrock ceilings, eight locations. Need to fire stop at upper lid as discussed.
|
BLD14-00767
| FIRE-Conference | 9/26/2014 | 9/26/2014 | 9/26/2014 10:39:04 AM | A | DONE |
|
|
On site conference with contractor regarding fire life safety inspection and fire sprinkler coverage at the new mechanical closet-
|
FIR14-00191
| INSP-Supply line flush | 9/25/2014 | 9/26/2014 | 9/26/2014 10:33:58 AM | A | NR |
|
|
Pending water supply to complete flushing.
|
FIR14-00694
| INSP-Sprinkler Rough-in | 9/25/2014 | 9/26/2014 | 9/26/2014 10:30:49 AM | A | PART |
|
|
Overhead fire sprinkler work approved for cover.
|