Inspections for the day of: Friday, September 26, 2014.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00556 BMP Violation9/24/20149/26/20149/29/2014 4:24:11 PMPPASS
check to see that reinspection fee is paid

Fee has now been paid. No new corrections required at site. WIP.
ESC13-00970 Site Final9/24/20149/26/20149/29/2014 4:14:05 PMPPASS
Outstanding fees paid. ESC permit conditions satisfied.
ESC14-00081 General Inspection9/26/20149/26/20149/26/2014 10:41:27 AM PASS
Vegetated buffer surrounds home. No trackout, culdesac is clean. Permit posted on back of large Bruno Built sign (currently blown over)

No corrections at this time.
ESC13-01247 General Inspection9/26/20149/26/20149/26/2014 10:39:49 AM PASS
Stabilization nearly accomplished at ACHD Mesa drainage project. Straw wattles still installed. Will keep open for rainy season monitoring. No corrections at this time
ESC13-00070 General Inspection9/26/20149/26/20149/26/2014 10:17:00 AM PASS
Terraces condo in progress. No issues. Trackout observed yesterday on Council Springs has been swept. Silt fence perimeter in good condition. Approved.
ESC13-00071 General Inspection9/26/20149/26/20149/26/2014 10:16:42 AM PASS
Terraces condo in progress. No issues. Trackout observed yesterday on Council Springs has been swept. Silt fence perimeter in good condition. Approved.
ESC13-00072 General Inspection9/26/20149/26/20149/26/2014 10:16:24 AM PASS
Terraces condo in progress. No issues. Trackout observed yesterday on Council Springs has been swept. Silt fence perimeter in good condition. Approved.
ESC14-00885 BMP Violation9/26/20149/26/20149/26/2014 10:09:16 AMAPASS
Corrections at Eckart Greenbelt path have been completed.

1. Additional wattles have been installed at the south channel/culvert of Council Springs Creek to prevent sediment runoff from running into the stream.
2. Gravel bags have been laid flat on culvert inlets to create filter and settling time for sediment.

3. Gravel bag put at the inlet of the north culvert near Lucky Harris construction entrance.

Other:
Water truck was onsite to keep down dust. The two channels may be diverted so that when the path crosses the creek they can stop flow.

Approved.

ESC14-00513 General Inspection9/26/20149/26/20149/26/2014 9:12:43 AM PASS
WIP. Interior tennant improvement in existing space for new market. No trenching in parking lot or earth disturbance occuring.

No corrections.
ESC13-00909 Site Final9/25/20149/26/20149/26/2014 9:09:15 AMAPASS
Nick Phone #: ###-####



RP onsite removing DI bag in MS4 on Cassia, final gutter sweep, and permit sign. Project has been compliant through duration. Parking lot, curbing, and landscaping complete.

ESC conditions satisfied.
ESC13-00909 DOC - Permit Finaled9/26/20149/26/20149/26/2014 9:02:51 AMPPASS
ESC13-01314 Aging Inspection9/26/20149/26/20149/26/2014 7:53:39 AM PASS
Pine Tree Village Townhome building in progress. Frame and siding installed. Work occuring in the interior.

ESC corrections have been made at site earlier this week on Pine Valley and Shoup and work area is still in compliance.
ESC13-01315 Aging Inspection9/26/20149/26/20149/26/2014 7:53:23 AM PASS
Pine Tree Village Townhome building in progress. Frame and siding installed. Work occuring in the interior.

ESC corrections have been made at site earlier this week on Pine Valley and Shoup and work area is still in compliance.
ESC13-01312 Aging Inspection9/26/20149/26/20149/26/2014 7:53:08 AM PASS
Pine Tree Village Townhome building in progress. Frame and siding installed. Work occuring in the interior.

ESC corrections have been made at site earlier this week on Pine Valley and Shoup and work area is still in compliance.
ESC13-01311 Aging Inspection9/26/20149/26/20149/26/2014 7:46:10 AM PASS
Pine Tree Village Townhome building in progress. Frame and siding installed. Work occuring in the interior.

ESC corrections have been made at site earlier this week on Pine Valley and Shoup and work area is still in compliance.
ESC13-01309 Aging Inspection9/26/20149/26/20149/26/2014 7:45:49 AM PASS
Pine Tree Village Townhome building in progress. Frame and siding installed. Work occuring in the interior.

ESC corrections have been made at site earlier this week on Pine Valley and Shoup and work area is still in compliance.