ESC14-00556
| BMP Violation | 9/24/2014 | 9/26/2014 | 9/29/2014 4:24:11 PM | P | PASS |
|
|
check to see that reinspection fee is paid
Fee has now been paid. No new corrections required at site. WIP.
|
ESC13-00970
| Site Final | 9/24/2014 | 9/26/2014 | 9/29/2014 4:14:05 PM | P | PASS |
|
|
Outstanding fees paid. ESC permit conditions satisfied.
|
ESC14-00081
| General Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 10:41:27 AM | | PASS |
|
|
Vegetated buffer surrounds home. No trackout, culdesac is clean. Permit posted on back of large Bruno Built sign (currently blown over)
No corrections at this time.
|
ESC13-01247
| General Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 10:39:49 AM | | PASS |
|
|
Stabilization nearly accomplished at ACHD Mesa drainage project. Straw wattles still installed. Will keep open for rainy season monitoring. No corrections at this time
|
ESC13-00070
| General Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 10:17:00 AM | | PASS |
|
|
Terraces condo in progress. No issues. Trackout observed yesterday on Council Springs has been swept. Silt fence perimeter in good condition. Approved.
|
ESC13-00071
| General Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 10:16:42 AM | | PASS |
|
|
Terraces condo in progress. No issues. Trackout observed yesterday on Council Springs has been swept. Silt fence perimeter in good condition. Approved.
|
ESC13-00072
| General Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 10:16:24 AM | | PASS |
|
|
Terraces condo in progress. No issues. Trackout observed yesterday on Council Springs has been swept. Silt fence perimeter in good condition. Approved.
|
ESC14-00885
| BMP Violation | 9/26/2014 | 9/26/2014 | 9/26/2014 10:09:16 AM | A | PASS |
|
|
Corrections at Eckart Greenbelt path have been completed.
1. Additional wattles have been installed at the south channel/culvert of Council Springs Creek to prevent sediment runoff from running into the stream. 2. Gravel bags have been laid flat on culvert inlets to create filter and settling time for sediment.
3. Gravel bag put at the inlet of the north culvert near Lucky Harris construction entrance.
Other: Water truck was onsite to keep down dust. The two channels may be diverted so that when the path crosses the creek they can stop flow.
Approved.
|
ESC14-00513
| General Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 9:12:43 AM | | PASS |
|
|
WIP. Interior tennant improvement in existing space for new market. No trenching in parking lot or earth disturbance occuring.
No corrections.
|
ESC13-00909
| Site Final | 9/25/2014 | 9/26/2014 | 9/26/2014 9:09:15 AM | A | PASS |
|
|
Nick Phone #: ###-####
RP onsite removing DI bag in MS4 on Cassia, final gutter sweep, and permit sign. Project has been compliant through duration. Parking lot, curbing, and landscaping complete.
ESC conditions satisfied.
|
ESC13-00909
| DOC - Permit Finaled | 9/26/2014 | 9/26/2014 | 9/26/2014 9:02:51 AM | P | PASS |
|
|
|
ESC13-01314
| Aging Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 7:53:39 AM | | PASS |
|
|
Pine Tree Village Townhome building in progress. Frame and siding installed. Work occuring in the interior.
ESC corrections have been made at site earlier this week on Pine Valley and Shoup and work area is still in compliance.
|
ESC13-01315
| Aging Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 7:53:23 AM | | PASS |
|
|
Pine Tree Village Townhome building in progress. Frame and siding installed. Work occuring in the interior.
ESC corrections have been made at site earlier this week on Pine Valley and Shoup and work area is still in compliance.
|
ESC13-01312
| Aging Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 7:53:08 AM | | PASS |
|
|
Pine Tree Village Townhome building in progress. Frame and siding installed. Work occuring in the interior.
ESC corrections have been made at site earlier this week on Pine Valley and Shoup and work area is still in compliance.
|
ESC13-01311
| Aging Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 7:46:10 AM | | PASS |
|
|
Pine Tree Village Townhome building in progress. Frame and siding installed. Work occuring in the interior.
ESC corrections have been made at site earlier this week on Pine Valley and Shoup and work area is still in compliance.
|
ESC13-01309
| Aging Inspection | 9/26/2014 | 9/26/2014 | 9/26/2014 7:45:49 AM | | PASS |
|
|
Pine Tree Village Townhome building in progress. Frame and siding installed. Work occuring in the interior.
ESC corrections have been made at site earlier this week on Pine Valley and Shoup and work area is still in compliance.
|