FIR16-00417
| INSP-Final Inspection | 9/23/2016 | 9/26/2016 | 9/26/2016 1:43:13 PM | P | CANC |
|
|
Project is not ready for a final yet due to fire alarm not being installed yet.
|
FIR16-00434
| INSP-Sprinkler Rough-in/Hydro | 9/23/2016 | 9/26/2016 | 9/26/2016 1:42:38 PM | P | PASS |
|
|
Overhead hydro tests passed.
|
FIR16-00435
| INSP-Sprinkler Rough-in/Hydro | 9/23/2016 | 9/26/2016 | 9/26/2016 1:42:13 PM | P | FAIL |
|
|
Riser manifold is still leaking
|
BLD16-03308
| FIRE-Final Inspection | 9/23/2016 | 9/26/2016 | 9/26/2016 11:42:01 AM | A | FAIL |
|
|
Repair the three emergency lights and provide two 2A,10BC fire extinguishers with current inspection tags as discussed.
|
NAF16-00055
| INSP-Sprinkler Rough-in | 9/23/2016 | 9/26/2016 | 9/26/2016 11:41:13 AM | A | PASS |
|
|
Underground supply piping is ok for cover. Tim/scott approved the piping needing to meet the 4'6" dept of cover with-in 20' of connection point.
|
BLD16-03466
| FIRE-Final Inspection | 9/22/2016 | 9/26/2016 | 9/26/2016 8:35:44 AM | A | PASS |
|
|
Life safety passed
|
FIR16-00439
| INSP-Sprinkler Rough-in | 9/23/2016 | 9/26/2016 | 9/26/2016 8:11:57 AM | A | PASS |
|
|
The one head that had to be moved for the handicapped water heater is ok to be covered again.
|