FIR16-00555
| INSP-Sprinkler Rough-in | 9/26/2016 | 9/26/2016 | 9/26/2016 10:51:05 AM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping located on level 1 complete, overhead fire sprinkler piping on level 1 approved for cover.
|
BLD15-01115
| FIRE-Final Inspection | 9/26/2016 | 9/26/2016 | 9/26/2016 10:01:34 AM | A | PASS |
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place, some have current inspection tags, others will be getting tagged by a licensed contractor (will verify current inspection tag during follow up inspection on other builings at jobsite) Knox box is in place, knox caps for FDC/Standpipe are on order and will be installed after received. Final life fire safety inspection for building T passed/complete.
|
FIR16-00438
| INSP-Final Inspection | 9/23/2016 | 9/26/2016 | 9/26/2016 9:47:47 AM | A | PASS |
|
|
Final fire alarm inspection passed/complete
|
BLD16-00718
| FIRE-Final Inspection | 9/23/2016 | 9/26/2016 | 9/26/2016 8:45:30 AM | A | PASS |
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete, final commercial hood fire suppression system inspection complete (Hood suppression modifications under FIR16-00592, permit is not attached to project), fire extinguishers are in place with current inspection tags, inspection tags will expire in November 2016. Final life fire safety inspection passed/complete.
|