PLM17-02620
| Groundwork | 9/26/2017 | 9/26/2017 | 9/26/2017 3:54:53 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
PLM17-02620
| Final | 9/26/2017 | 9/26/2017 | 9/26/2017 3:54:39 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
PLM17-02617
| Groundwork | 9/26/2017 | 9/26/2017 | 9/26/2017 3:41:25 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
PLM17-02617
| Final | 9/26/2017 | 9/26/2017 | 9/26/2017 3:41:13 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
PLM17-02840
| Water and/or Sewer | 9/26/2017 | 9/26/2017 | 9/26/2017 3:33:50 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
PLM17-02840
| Final | 9/26/2017 | 9/26/2017 | 9/26/2017 3:33:32 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
PLM17-02666
| Water and/or Sewer | 9/26/2017 | 9/26/2017 | 9/26/2017 3:33:12 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
PLM17-02667
| Water and/or Sewer | 9/26/2017 | 9/26/2017 | 9/26/2017 3:32:52 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
PLM17-02667
| Final | 9/26/2017 | 9/26/2017 | 9/26/2017 3:32:39 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
PLM17-02667
| Final | 9/26/2017 | 9/26/2017 | 9/26/2017 3:31:11 PM | P | PASS |
|
|
Phil Phone #: ###-####
|
PLM17-02668
| Water and/or Sewer | 9/26/2017 | 9/26/2017 | 9/26/2017 3:30:46 PM | P | FAIL |
|
|
Phil Phone #: ###-#### install schedule 40 sewer at water line crossing, 10' each side
|
PLM17-03667
| Water and/or Sewer | 9/25/2017 | 9/26/2017 | 9/26/2017 3:12:49 PM | P | PART |
|
|
Jordan Spivey, contact Phone #: ###-#### Inspection requested via web by Caleb Case water line ok to cover, will need a well disconnect, owner needs to contact Suez Water to set up billing and coordinate meter installation.
|
PLM17-03686
| Water and/or Sewer | 9/26/2017 | 9/26/2017 | 9/26/2017 3:11:16 PM | P | PART |
|
|
should be ready about noon Inspection requested via web by john brown water line ok sewer not ready
|
PLM17-03624
| Final | 9/25/2017 | 9/26/2017 | 9/26/2017 2:21:54 PM | P | NR |
|
|
Jim reed is onsite contact. ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby not ready noone around
|
PLM17-02805
| Final | 9/25/2017 | 9/26/2017 | 9/26/2017 2:07:15 PM | P | PASS |
|
|
Inspection requested via web by Craig Allumbaugh
|
PLM17-03486
| Plumbing Rough-in | 9/26/2017 | 9/26/2017 | 9/26/2017 12:02:17 PM | P | NR |
|
|
Brandon Phone #: ###-#### tests pass but need something from the engineer deleting the floor sinks and addressing ice maker waste.
|
PLM17-03661
| Water and/or Sewer | 9/25/2017 | 9/26/2017 | 9/26/2017 11:15:29 AM | A | PASS |
|
|
Larry Phone #: ###-####
|
PLM17-03661
| Final | 9/26/2017 | 9/26/2017 | 9/26/2017 11:15:16 AM | P | PASS |
|
|
Larry Phone #: ###-####
|
PLM17-03644
| Water Heater Final | 9/22/2017 | 9/26/2017 | 9/26/2017 11:01:40 AM | A | NH |
|
|
please call pat one hour before arrival. Phone #: ###-#### Inspection requested via web by JEREMY LINK not available today, will call when he can be there.
|
PLM17-03171
| Groundwork | 9/25/2017 | 9/26/2017 | 9/26/2017 10:48:58 AM | A | PART |
|
|
Area drain partial sub rough, West side of garage Phone #: ###-#### Inspection requested via web by Preston Langdon basement parking area drains, two on the west side and the trench drain at the bottom of the ramp test ok.
|
PLM17-03613
| Plumbing Rough-in | 9/25/2017 | 9/26/2017 | 9/26/2017 10:48:29 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Jeff naumann ri ok sewer test ok just needs sewer camera
|
PLM17-03462
| Water Heater Final | 9/26/2017 | 9/26/2017 | 9/26/2017 10:38:32 AM | P | PASS |
|
|
|
PLM17-03462
| Water Heater Final | 9/20/2017 | 9/26/2017 | 9/26/2017 8:49:09 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by Ron Arnold called no answer went by left notice
|
PLM17-02814
| Plumbing Rough-in | 9/25/2017 | 9/26/2017 | 9/26/2017 8:29:00 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve Spence ri ok
|
PLM17-00832
| PLM-Aging Inspection | 9/26/2017 | 9/26/2017 | 9/26/2017 7:44:23 AM | | PEND |
|
|
called Tyler and left a message
|
PLM17-03695
| Water and/or Sewer | 9/26/2017 | 9/26/2017 | 9/26/2017 12:00:00 AM | P | PART |
|
|
this permit is for the sewer extention from the right a way to the property. Public works is going to watch the installation and test wit their main.
|