ELE19-03523
| Final | 9/25/2019 | 9/26/2019 | 9/26/2019 3:32:10 PM | P | PASS |
|
|
Electrician: Jon Lemos Hot tub installation Phone #: ###-#### Inspection requested via web by Same Electric Ok final. No bonding required
|
ELE19-02741
| Final | 9/26/2019 | 9/26/2019 | 9/26/2019 1:50:30 PM | P | PASS |
|
|
Number provided is resident. Someone will be home. Journeyman contact is Josh Smith ###-#### Phone #: ###-#### Inspection requested via web by Candy Magly Ok final.
|
ELE19-03465
| Final | 9/25/2019 | 9/26/2019 | 9/26/2019 1:50:01 PM | P | NR |
|
|
Teddy Phone #: ###-####
|
ELE19-03666
| Temporary Service | 9/26/2019 | 9/26/2019 | 9/26/2019 12:28:52 PM | P | PASS |
|
|
Pole in backyard Phone #: ###-#### Inspection requested via web by Shaun Kirkman t/s o/h n ok
|
ELE19-03578
| Electrical Rough-In | 9/26/2019 | 9/26/2019 | 9/26/2019 12:24:40 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok cover main floor living, kitchen and mstr bed. Basement small room to left of stairs. 2 outlets to left and right of kitchen sink need to be within 24". Will need to see on final.
|
ELE19-03023
| Electrical Rough-In | 9/26/2019 | 9/26/2019 | 9/26/2019 11:53:52 AM | P | PASS |
|
|
Pool bonding grid inspection Phone #: ###-#### Inspection requested via web by Angela Stears Ok cover EQ plane. Also runs on backside of negative edge.
|
ELE19-03591
| Electrical Rough-In | 9/25/2019 | 9/26/2019 | 9/26/2019 10:44:12 AM | A | PASS |
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon Ok cover up bath.
|
ELE19-03362
| Electrical Rough-In | 9/21/2019 | 9/26/2019 | 9/26/2019 10:20:30 AM | A | PASS |
|
|
Justin is crew lead and best contact. The crew will arrive to install in the morning. Office line is ###-####. Phone #: ###-#### Inspection requested via web by Amy Simms Ok cover. Jinko 315 used, 310 listed on paperwork. Cut sheets have range of 300 to 325. Approved by city.
|
ELE19-03657
| Electrical Rough-In | 9/26/2019 | 9/26/2019 | 9/26/2019 10:07:58 AM | A | PASS |
|
|
listing inspection for solar equipment; first day of panels; everything on the ground; crew starts at 8; thank you guys Phone #: ###-#### Inspection requested via web by Ryan King Ok cover. Pabels onsite match listing of paperwork provided.
|
ELE19-03023
| Final | 9/26/2019 | 9/26/2019 | 9/26/2019 10:02:27 AM | P | CANC |
|
|
bonding grid inspection Phone #: ###-#### >> Inspection requested via web by Angela Stears Inspection cancelled from web by: Angela Stears
|
ELE19-03642
| Electrical Rough-In | 9/25/2019 | 9/26/2019 | 9/26/2019 10:02:12 AM | A | PASS |
|
|
It''s a tricky one, please call Tony at ###-#### with any questions Phone #: ###-#### Inspection requested via web by TOM BICANDI Ok cover main level E side, and up bath. Notified contractor that an outlet was needed to left of bath door.
|
ELE19-02717
| Final | 9/26/2019 | 9/26/2019 | 9/26/2019 9:20:03 AM | A | PASS |
|
|
code 4321 Phone #: ###-#### Inspection requested via web by Richard Gratiot Ok final.
|
ELE19-03113
| Final | 9/25/2019 | 9/26/2019 | 9/26/2019 8:55:00 AM | A | PASS |
|
|
Call Kent on your way please ###-####. If you have any questions please feel free to contact Chaz ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final. A couple of plates off for painting.
|