BLD19-02562
| BLD-Framing/Rough-in | 9/26/2019 | 9/26/2019 | 9/26/2019 4:24:43 PM | P | PASS |
|
|
Call ahead 30 minutes // Omyra Phone #: ###-####
|
BLD18-01425
| BLD-Final | 9/26/2019 | 9/26/2019 | 9/26/2019 4:05:54 PM | P | PASS |
|
|
James Phone #: ###-####. OK for perm occ.
|
MIS19-00318
| BLD-Conference | 9/26/2019 | 9/26/2019 | 9/26/2019 3:36:20 PM | P | FAIL |
|
|
Need CO. Change of occupancy no permits. Tenant not on site, doors locked. A correction notice was issued to obtain a building permit for work done. Needs to submit plans to planning for approvals and schedule all required inspections to obtain a cert. of occupancy. A reinspection has been scheduled for Oct 10th. to check on status and issue 5 day notice if needed.
|
BLD19-03524
| BLD-Final | 9/26/2019 | 9/26/2019 | 9/26/2019 3:10:59 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Dexter
|
BLD19-03524
| DOC - Permit Finaled | 9/26/2019 | 9/26/2019 | 9/26/2019 3:10:52 PM | P | PASS |
|
|
|
BLD19-03296
| BLD-Final | 9/24/2019 | 9/26/2019 | 9/26/2019 3:09:20 PM | P | DONE |
|
|
Contact Rob Smith with any questions ###-#### Phone #: ###-#### Inspection requested via web by Rob Maes
|
BLD19-03296
| DOC - Permit Finaled | 9/26/2019 | 9/26/2019 | 9/26/2019 3:09:13 PM | P | PASS |
|
|
|
BLD18-03245
| BLD-Conference | 9/25/2019 | 9/26/2019 | 9/26/2019 3:09:00 PM | P | DONE |
|
|
Discuss plumbing penetrations in fire rated walls. if possible could we request a time window to have plumber on site. Phone #: ###-#### Inspection requested via web by Robbie Andrews. OK to insulate 2nd floor at common area only. Provide listings for 3m fire foam for use on pex.
|
BLD19-03566
| BLD-Final | 9/25/2019 | 9/26/2019 | 9/26/2019 2:30:06 PM | P | NR |
|
|
Allison Phone #: ###-####. No access. doors locked.
|
BLD18-03662
| BLD-Wall cover | 9/26/2019 | 9/26/2019 | 9/26/2019 2:13:09 PM | P | PASS |
|
|
Daryli Phone #: ###-####
|
BLD19-03099
| BLD-Footing | 9/26/2019 | 9/26/2019 | 9/26/2019 1:55:39 PM | P | PASS |
|
|
Ryan Phone #: ###-####. Will bulk head portion of footing in back by basement until backfilled.
|
BLD19-03665
| BLD-Framing/Rough-in | 9/26/2019 | 9/26/2019 | 9/26/2019 1:32:53 PM | P | PASS |
|
|
Steven Phone #: ###-####
|
BLD18-04288
| BLD-Concrete | 9/26/2019 | 9/26/2019 | 9/26/2019 12:41:26 PM | P | CANC |
|
|
second floor rebar and 6x6 mesh inspection and decking screw inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD18-00578
| BLD-Final | 9/25/2019 | 9/26/2019 | 9/26/2019 10:58:14 AM | P | CANC |
|
|
Code to Enter is 8188. Electrical re-inspection occurs in the morning, Call Chris with any issues or concerns. Phone #: ###-#### >> Inspection requested via web by Chris Laraway Inspection cancelled from web by: Chris Laraway
|
BLD19-01485
| BLD-Framing/Rough-in | 9/25/2019 | 9/26/2019 | 9/26/2019 10:02:23 AM | A | PASS |
|
|
We had to order long 5’ straps for garage portal frame. Phone #: ###-#### Inspection requested via web by Joel Hirtle. All corrections made. Will inspect portal straps on energy inspection.
|
BLD19-02660
| BLD-Ceiling Grid Inspection | 9/25/2019 | 9/26/2019 | 9/26/2019 9:34:09 AM | A | NR |
|
|
Tony Phone #: ###-####. A mech. permit is required for the new and altered duct work that has been installed.
|
BLD14-03607
| BLD-Final | 9/24/2019 | 9/26/2019 | 9/26/2019 9:17:46 AM | A | PASS |
|
|
Kevin Phone #: ###-####. Ok for perm occ.
|
BLD19-03725
| BLD-Final | 9/25/2019 | 9/26/2019 | 9/26/2019 8:53:19 AM | A | DONE |
|
|
Joseph Phone #: ###-####
|
BLD19-03725
| DOC - Permit Finaled | 9/26/2019 | 9/26/2019 | 9/26/2019 8:52:55 AM | P | PASS |
|
|
|
BLD19-03216
| BLD-Final | 9/25/2019 | 9/26/2019 | 9/26/2019 8:52:26 AM | A | PASS |
|
|
gary Phone #: ###-####
|
BLD19-03216