MEC99-03113
| Pressure Test | 9/24/1999 | 9/27/1999 | 9/27/1999 12:00:00 AM | A | FAIL |
|
|
###-#### Done #408
|
MEC99-02918
| Pressure Test | 9/24/1999 | 9/27/1999 | 9/27/1999 12:00:00 AM | A | FAIL |
|
|
Bob ###-#### No test found
|
BLD99-02885
| BLD-Footing | 9/24/1999 | 9/27/1999 | 9/27/1999 12:00:00 AM | A | PART |
|
|
Walt ###-#### Footing ok
|
MEC99-02483
| Rough-in | 9/24/1999 | 9/27/1999 | 9/27/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/24/1999 at 12:00:14. Contact: ###-####. Looked at chase
|
MEC99-03143
| Final | 9/24/1999 | 9/27/1999 | 9/27/1999 12:00:00 AM | P | PASS |
|
|
lee- ###-#### fireplace only
|
MEC99-03133
| Final | 9/27/1999 | 9/27/1999 | 9/27/1999 12:00:00 AM | P | FAIL |
|
|
gordon-- ###-#### fn insp left C/N
|
MEC98-00576
| Final | 9/27/1999 | 9/27/1999 | 9/27/1999 12:00:00 AM | P | FAIL |
|
|
DIANE LATE PM ###-#### Left C/N
|
MEC99-03117
| Rough-in | 9/27/1999 | 9/27/1999 | 9/27/1999 12:00:00 AM | P | PASS |
|
|
andy ###-####
|
MEC99-03117
| Pressure Test | 9/27/1999 | 9/27/1999 | 9/27/1999 12:00:00 AM | P | PASS |
|
|
andy ###-####
|
MEC99-03139
| Rough-in | 9/24/1999 | 9/27/1999 | 9/24/1999 12:00:00 AM | P | PART |
|
|
Andrea ###-#### Frame F/P-need gasline
|