BLD00-01456
| BLD-Final | 9/25/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 15:44:09. Contact: ###-####.
|
BLD00-02313
| BLD-Concrete | 9/26/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | A | PART |
|
|
Mike ###-####; ok pending spec insp report 9/27/2000 11:12:25 AM
|
BLD00-01605
| BLD-Final | 9/26/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | A | FAIL |
|
|
###-#### AJ or ###-#### Shawn c/n issued, recall 9/27/2000 11:40:13 AM
|
MIS00-00224
| BLD-Conference | 9/26/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | A | PART |
|
|
blk and tie Pauline ###-####
|
BLD99-03170
| BLD-Final | 9/26/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/26/2000 at 14:45:56. Contact: ###-####.card to contractor, l/c only for shell 9/27/2000 1:08:19 PM
|
BLD00-01084
| BLD-Conference | 9/27/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 9/27/2000 w/ MIke Huttash re final req's for corridor uprade
|
BLD00-01801
| BLD-Concrete | 9/27/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 9/27/2000 sub-ftgs, ok pend reports
|
BLD00-01366
| BLD-Concrete | 9/27/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/27/2000 ok to use waterproof additive at slab, w/pt lumber sills. per 325
|
BLD00-02625
| BLD-Framing/Rough-in | 9/26/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | P | PART |
|
|
James ###-#### or Paul ###-####, blocking ok, complete occ sep. wall, ok to begin lid at far end 9/27/2000 3:05:36 PM
|
BLD00-02382
| BLD-Framing/Rough-in | 9/27/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | P | PART |
|
|
###-####- VICTOR-- SHEAR PANEL BEFORE SIDING
|
BLD00-01646
| BLD-Conference | 9/27/2000 | 9/27/2000 | 9/27/2000 12:00:00 AM | P | PART |
|
|
###-####
|