Inspections for the day of: Wednesday, September 27, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01456 BLD-Final9/25/20009/27/20009/27/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/25/2000 at 15:44:09. Contact: ###-####.
BLD00-02313 BLD-Concrete9/26/20009/27/20009/27/2000 12:00:00 AMAPART
Mike ###-####; ok pending spec insp report 9/27/2000 11:12:25 AM
BLD00-01605 BLD-Final9/26/20009/27/20009/27/2000 12:00:00 AMAFAIL
###-#### AJ or ###-#### Shawn c/n issued, recall 9/27/2000 11:40:13 AM
MIS00-00224 BLD-Conference9/26/20009/27/20009/27/2000 12:00:00 AMAPART
blk and tie Pauline ###-####
BLD99-03170 BLD-Final9/26/20009/27/20009/27/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/26/2000 at 14:45:56. Contact: ###-####.card to contractor, l/c only for shell 9/27/2000 1:08:19 PM
BLD00-01084 BLD-Conference9/27/20009/27/20009/27/2000 12:00:00 AMAPART
Added by Inspector: 340 On 9/27/2000 w/ MIke Huttash re final req's for corridor uprade
BLD00-01801 BLD-Concrete9/27/20009/27/20009/27/2000 12:00:00 AMAPART
Added by Inspector: 340 On 9/27/2000 sub-ftgs, ok pend reports
BLD00-01366 BLD-Concrete9/27/20009/27/20009/27/2000 12:00:00 AMPPART
Added by Inspector: 340 On 9/27/2000 ok to use waterproof additive at slab, w/pt lumber sills. per 325
BLD00-02625 BLD-Framing/Rough-in9/26/20009/27/20009/27/2000 12:00:00 AMPPART
James ###-#### or Paul ###-####, blocking ok, complete occ sep. wall, ok to begin lid at far end 9/27/2000 3:05:36 PM
BLD00-02382 BLD-Framing/Rough-in9/27/20009/27/20009/27/2000 12:00:00 AMPPART
###-####- VICTOR-- SHEAR PANEL BEFORE SIDING
BLD00-01646 BLD-Conference9/27/20009/27/20009/27/2000 12:00:00 AMPPART
###-####